Loading...
SR-508-000 (30) ,- GS:SS:DM:ks e Santa Monica, ~fornla, September 16, 1981 5025~OtDO 1-C SEP 2 2 1981 TO: Mayor and Clty Councll FROM: City Staff SUBJECT: Proposed Concrete Gutter Construction and Tree Planting on Wilshire Boulevard Between Ocean Avenue and Twenty-First Street Introductlon ThlS report requests City Council hold a public hearing for the construction of concrete gutters and the planting of trees on Wilshire Boulevard between Ocean Avenue and Twenty-first Street. Bac kgrounE-. On August 12, 1980, staff presented the Wilshire Street Resurfacing Project, as well as the Fourth Street on-ramp, for the City's FAU proJect funded by the S1X- year Federal Aid Urban street reconstructlon fund. The Council chose the lJilshire proJect to submit for approval. Wilshire Boulevard was last resurfaced 27 years ago. The trafflc signals were lnter-connected and synchronized elght years ago. Buses and trucks have structurally deteriorated the pavement and heavy vehicular parking and water has eroded the asphalt gutters. Outside consultants have studied the street and have determlned that reconstructlon is necessary. Staff proposes to reconstruct the parking and adjacent drivlng lanes (from the curb to 20 feet from the curb) with Portland Cement Concrete. A two foot width of concrete at the curb will be poured separately to construct the gutter. This cost is proposed to be assessed to the property owner. In addltion, the City will plant large trees ln 42-lnch minlmum size boxes. The species wlll be ln accordance wlth the City's tree plan. ThlS project will provide a structurally Y}-c SEP 2 2 1981 . , GS:SS:DM:ks ... SubJect:Proposed Conc~e Gutter Construction and Tree Planting on Wilshire Boulevard between Ocean Avenue and Twenty-first Street Santa Monica, 4Itifornia, September 16, 1981 sound pavement for buses and heavy trucks that will last for many years and greatly reduce maintenance costs. In addition, there will be greater drainage capacity due to lncreased curb helght. The concrete gutters will also decrease maintenance costs. It is estlmated this project w1l1 reduce street maintenance costs by $10,000 annually. The estlmated assessment cost for the concrete gutters ;s $9.50/front foot. The actual cost will not be known until bids for the project are opened. The estimated assessment cost proposed for the tree planting is $3.00/front foot. Recommendation It is recommended City Council: 1. Open the public hearing; 2. Close the public hearing and overrule any protests; and 3. Adopt the resolution ordering the work. Prepared by: Stan Scholl Doug McAteer Attachment: Resolution e lJISTlUBU'l ION OF H,ESOlUTION # r{ _30J-- [ouncIl Meeting Date Cr-> _7 L... Agenda Item ,T /1 ~ f'J <. ~ 1,'a 5 it amended? ~-?A ':. / 1.--"'; I , VOTE: Affirmative' NegatIve: AbstaIn' Absent: f // .:l/ (,/ 't:-"---- /r C/ (~ /),./ ' /l.- ~~./_-...J e ORDI NAo'ICE 1/ Introduced: Adopted: .<} /J- (!? ORIGINAL to be SIgned, sealed and flIed in Vault. DlSTRTBUTIO~: :.lEl\'SPAPER PUBLICATION (Date: Departmelll orIginatIng staff report ( ~~dtA/() \ C,ty Attorney tt1~W.:u::t.. --cI~ ~T Agency mentIoned In document or staff report SubJe~t fIle (agenda packet) (certlfieJ?l_ Counter [lIe Others' AIrport Parklng Auth. Alall torum Personnel BUIIJlng l!ept. Planning Environ. Servo PolIce (en- fo rcelnen t?) I'Inance Purchasing [' J re Recr!Parks Generdl Servo Transportation [.llHary Treasurer Manager tI- SEI\D J.W(f COPl [S OF ALL ORDINA>JCES TO CODf.D SYSTEMS Attn Peter M~clear~e PROFESSIONAL tFNTER Iotal ROUTE 71 BRltLLE, ~EW JERSEY 08730 Others' TOTAL COP] L~S ) ) /" / / / 1 I // V ~ I .f e e RESOLUTION NO. 6365 (CITY COUHCIL SERIES) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA MONICA ORDERING THE CONSTRUCTION OF CONCRETE GUTTERS AND THE PLANTING OF TREES ON WILSHIRE BOULEVARD BETWEEN OCEA~ AVENUE AND TWENTY-FIRST STREET, ALL WITHIN THE CITY OF SANTA MONICA. W HER E AS, the City Co u n c il 0 f the City 0 f San taM 0 n i c a , on the 25th day of August, adopted Resolution No. 6350 (CCSl setting a public hearing; and WHEREAS, written notices of said improve~ent have been given in the manner required by law; and WHEREAS, any and all written obJections and protests to the ~ork or the extent of the district to be assessed were heard and considered by the City Council; NOW, THEREFORE, THE CITY COU~CIL OF THE CITY COUNCIL OF THE CITY OF SA~TA MONICA DOES RESOLVE AS FOLLOWS: SECTION 1 1. That the public convenience and necessity require the construction of concrete gutters and the plantlng of trees on Wilshire Boulevard between Ocean Avenue and Twenty-first Street, all wlthin the City of Santa Honica. SECTION 2. That all protests and objections of every kind and nature to the construction of concrete gutters and the plantlng of trees on Wilshire Boulevard between Ocean Avenue and Twenty-first Street, all within the City of Santa Monica, be and the same are hereby overruled and denied. SECTION 3. That pursuant to Streets and Hlghways Code Section 5880, the Street Superintendent is directed to commence ., e tit the construction of concrete gutters and the planting of trees above described if the construction and tree planting is not commenced and prosecuted to completion with due diligence by any property as required by Streets and Highways Code Section 5879. SECTION 4. That the City Clerk shall certify to the adoption of this resolution and thenceforth and thereafter the same shall be in full force and effect. APPROVED AS TO FORM: ~~.~ City A t to r n ey U " e e ADOPTED AND APPROVED THIS 22nd DAY OF September , 1 981. "------1 .//;/ l~ .1/ ( ;J /rl II ~~ti-C6~ ~y.-u; f /~v,' '7ll -- - - / / ~1AYOR /: i, U "---" I HEREBY CERTIFY THAT THE FOREGOI~G RESOLUTION NO. 6365 lMS DULY ADOPTED BY THE CITY COUnCIL OF THE CITY OF SAUTA. i"10rnCA AT A REGULAR r1EETI~~G THEREOF HELD ON September 22 , 1981 BY THE FOLLOtJIUG COUiiCIL VOTE: AYES: COUNCILMEMBERS: Conn, Edwards, Jennlngs. Zane, Mayor Yannatta Goldway, Reed tJOES: COU~ICILHEr-1BERS: ~one ABSENT: COUr~CIU1Ef1BERS: Press ABSTAIt~: courICILHEr13ERS: None ATTEST' a4l '7 )l-:4d-~ CITY CLERK