SR-580-005-01 Council Meeting: September 25, 2001 Santa Monica, CA TO: Mayor and Councilmembers FROM: City Staff SUBJECT: Recommendation to approve a revised approach to the Main Library Expansion Project, involving replacement of the existing building with a newly constructed facility. Introduction The Library Master Plan, as approved by the City Council on February 17, 1998, included a conceptual plan for expansion of the Main Library that incorporated renovation of the existing building and construction of a new addition. Based upon analysis of the financial, design and service impact of renovation versus replacement, this report recommends City Council approve a revised plan that includes demolition of the existing structure. Background The Santa Monica Main Library was constructed in 1965 and contains approximately 74,000 square feet, including basement parking. By 1986 it became apparent that the Library was outgrowing its current facility. The City used bond funds approved by the voters in 1988 to purchase the land adjacent to the building between 6th Court and Seventh Street for the Library?s future expansion. Planning for the new Main Library building began in 1986 with the preparation of a needs assessment study by library consultant Robert Rohlf. In 1996 the City contracted 1 with the architectural firm of Hardy Holzman Pfeiffer Associates (HHPA) for the development of a Library Master Plan, incorporating conceptual plans for the expansion of the Main Library and renovation options for each of the Branch Libraries. The Master Plan process included an analysis of several design alternatives. The concept of demolishing the existing facility was considered and dismissed, primarily as a result of the need to relocate the Library for the entire construction period. The resulting plan, developed with staff and community input, proposed a 51,000 square foot addition to the facility. On February 17, 1998 Council approved the concept and development of a project financing plan and implementation. In November 1998, Santa Monica voters approved Proposition L, a measure authorizing the sale of up to $25,000,000 in Government Obligation bonds for construction, renovation and expansion of the Main and Branch Libraries. Since that approval, staff has proceeded with the development of the project program and selected and entered into contracts with Bovis Lend Lease for project management and the architectural firm of Moore Ruble Yudell (MRY). Discussion During the initial planning phase with MRY, staff considered the feasibility and cost effectiveness of remodeling the existing facility versus demolition of the structure and construction of an entirely new library building. As the program budget was analyzed, it became apparent that demolition/new construction did have merit. The project management consultant estimated the costs to be nearly the same for the alternate 2 approaches, which was confirmed by other consultants. They suggested a number of factors would escalate the cost of renovation, including current market conditions in the construction industry; the costs associated with extending the project duration for renovation and phasing; required seismic and code compliance upgrades; the need for replacement of outdated/inadequate mechanical, electrical and plumbing systems; and, the unknowns inherent in the renovation of an existing structure. Considering these issues the project team felt that an approach utilizing demolition and all new construction should be considered. In addition to the financial analysis, the project team determined that design and efficiency factors would be facilitated by demolition and new construction. That approach is expected to provide the best opportunity to create a new landmark for the city; accommodate efficient design and the use of efficient building systems to showcase energy efficiency and sustainability; afford the best opportunity to respond to Santa Monica Boulevard, Sixth Street, and Seventh Street; be faster to build and support a more reliable construction schedule and cost estimate; allow the best opportunity to realize the full potential of the program and plan for future growth on the site; make basement parking more affordable and quicker to build; enable hazardous material removal to be more efficient and effective; enable the use of column spacing that best serves stack layouts and other program functions; optimize light, openness and views; and, allow the design to best reflect the city?s and library?s values. 3 Public Opinion Community input elicited during the original Library Master Plan process indicated that the public is not particularly committed to the existing Main Library building. Focus groups, public meetings and in-house survey techniques were used to solicit public input and comment. There were two aspects of the existing facility that received favorable remarks ? the openness of the main reading room and the natural light provided by the windows on the south side of that room. Staff expressed similar comments. These characteristics of spaces within the building are what people have found attractive, as opposed to features of the building itself; and those characteristics can be easily incorporated into a newly designed facility. More recently, formal and informal discussions with the community about the Main Library have demonstrated support for the notion of demolishing the existing facility. The Library Board is supportive of the idea after a thorough discussion of the topic held over a series of their recent meetings. On September 15 a community meeting was held at the Main Library with MRY presenting an examination of library design issues and leading a discussion on the merits of demolition over renovation. Once again the public supported the notion of removing the existing facility to allow for a more efficient and unified design. Other Considerations The current Main Library facility has not been listed on any register of historic places. It does not meet the criteria set forth for qualification for the National Register of Historic 4 Places or the California Historical Landmarks registry. A thorough evaluation of the building?s eligibility for such classification will be incorporated into the environmental impact report. Two principal concerns have been voiced about removing the existing Main Library building. First is the concern that using this approach would mean sacrificing some space for the library. The other is a concern regarding the need to relocate Main Library services during construction. Removal of the existing building will not have a major impact on the space available for Library services. The HHPA conceptual plan called for a building of 112,000 square feet. The current plan includes 104,300 square feet for the Library plus 5,000 square feet for the Santa Monica Historical Society museum, making the total facility 109,300 square feet. While the overall building is somewhat smaller, efficient design will enable the space assigned to Library functions to be slightly greater than the figure in the Master Plan. And, while many decisions in the planning process have an effect on the cost of the project, a careful comparison of the cost of renovation versus demolition/new construction has shown the costs to be nearly equal, including an estimated cost for temporary relocation. Either approach to design and construction will have a significant impact on how Library service is provided. Renovation would require operating with little or no off-street 5 parking adjacent to the building. Numerous closures would be required and the project duration would be considerably longer. Staff is actively looking for an effective temporary home for the Library during construction. The use of existing, vacant buildings is being explored, as is the use of different types of temporary structures. Foremost in this planning is the desire to continue high quality library service to the public. As was done during the Main Library closure in 1986/87 it is anticipated that some staff and some services will be relocated to the newly renovated Branch Libraries. The Rohlf Study (1986) includes a summary statement relevant to the question of demolition. The report states, ?It is not inconceivable that an entirely new building of the appropriate size (and) of efficient design would not only be the best but also the least expensive long term solution to the problems and inadequacies of the present building.? The project team agrees. Budget Impact There is no budget impact. The total project is expected to cost approximately $49.5 million. Funds in the amount of $45 million for this project are included in the Capital Improvements Program. A request for additional funds may be made at a later date when a design/build contract is awarded. The decision to demolish the existing facility will not affect the project budget. 6 Recommendation Staff recommends Council approve a revised approach to the Main Library Expansion Project, involving replacement of the existing building with a newly constructed facility. Prepared by: Wini Allard, City Librarian Greg Mullen, Assistant City Librarian Lauren Friedman, Senior Architect 7