R-8408
e
e
FD CLC Ilh/MACwp/dlsk
CIty Council MeetIng
Santa Monica, California
RESOLUTION NUMBER 8408 (CCS)
(City Council Senes)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA MONICA
ESTABLISHING FEES FOR FIRE DEPARTMENT PERMITS, INSPECTION AND PLAN
REVIEW
WHEREAS. Ordmance No authorizes the establishment of fees
by resolution of the City CouncIl to admmlster FIre Department permit,
mspectlon and plan reViews,
WHEREAS. The CIty Council determmed that It IS reasonable to
charge for the cost of servIces when such servIces benefit indiVidual
users rather than members of the community as a whole,
WHEREAS, The City Council determined that fees for permits, fire
prevention Inspections and plan review should cover the cost of such
service
NOW, THEREFORE, THE CITY COUNCil OF THE CITY OF SANTA MONICA
DETERMINES THAT THE FEES FOR FIRE DEPARTMENT PERMITS, INSPECTIONS
AND PLAN REVIEW SHALL BE AS FOLLOWS
SECTION 1 FEE SCHEDULE
Schedule 1 Santa MonIca MunIcIpal Code Permit Fees
1
e
e
The following fees shall be collected for each calendar year or fraction
thereof commencing July 1, 1992
Category
Fee
Operate or maintain a laboratory
$61 00
2 Operate or maintain any of the following occupancies
A Hospital
B Residential Care Facility
C Day Care
50 or more
less than 50
D Private School
E Pre-school
F Boarding Home
$61 00
$61 00
$61 00
$61 00
$61 00
$61 00
$61 00
Schedule 2 Uniform Fire Code Permit Fees
The following fees shall be collected for each calendar year or fraction
thereof commencing July 1, 1992 for the process, activity or operation
indicated *when a permit IS reqUired by the Uniform Fire Code*
1 Aircraft Refueling Vehicles
$61 00
2 Al rcraft Repal r Hang ar
$61 00
3 Assembly, Public
A 5,000 sf or more
B less than 5,000 sf
$61 00
$30 00
4 Automobile Repair Garage
$61 00
5 Candles and Open Flame In Assembly Use Areas
A Annual
$30 00
2
e e
B Special Events $30 00
6 Carnivals and Fairs $61 00
7 Christmas Tree Lots $61 00
8 Combustible FIbers $61 00
9 Combustible Matenals $61 00
>2,500 cu ft
10 Compressed Gases
A Nonflammable $61 00
B Flammable $61 00
1 1 Cryogenics $61 00
12 Dust ProdUCing for first $61 00
$30 00 for each additIOnal
To a maximum of $200 00
13 Explosives
A Class I Magazine $61 00
B Class II Magazine $61 00
14 FIreworks, Public Display
A Ground Display per day $61 00
B Aerial Display per day $122 00
15 Flammable Llq U Ids
A Store $61 00
B Dispense $30 00
C Use $30 00
16 Fumigations $61 00
3
e
e
17 Hazardous Materials
(Sizes based on Resolution 8127(CCS))
A Type 1
Low risk hazard -1-2 hazard
classification (s)
$61 00
B Type 2
Moderate risk hazard - 3-4 hazard
clasSifIcations
$122 00
C Type 3
High risk hazard - 5-6 hazard
clasSifications
$183 00
D Type 4
Severe risk hazard - 7 or more
hazard classificatIOns
$244 00
18 High Pile Stock
$61 00
19 High-rise Inspections per hour
$61 00
20 LIquefied Petroleum Gas
A Store
B Dispense
C Use
$61 00
$30 00
$30 00
21 Magnesium Working
$30 00
22 Mall, Use
$30 00
23 Industrial Ovens (per oven)
$30 00
24 Refngeratlon Equipment
(per system)
$30 00
4
e
e
25 Spraymg or Dlppmg wIth
Flammable or Combustible Liquids
$61 00
26 Special Effects, Pyrotechnics
Per day or fraction thereof.
A I ntenor
B Extenor
C Explosions
$61 00
$61 00
$61 00
27 Tents, Canopies or
Membrane Structures
A Permanent Canopies
B up to 400 sf
C 401 to 2000 sf
D 2001 to 6000 sf
E 6001 or more
$30 00
$61 00
$122 00
$183 00
$213 00
28 Tire Recapping
$61 00
29 Tire Storage
In excess of 1000 cu ft
$61 00
30 Waste Material Handling Plant
$61 00
31 Welding and Cutting Operations
InvolVing Compressed or
Flammable Gases
$61 00
32 Other Processes, Operations,
Use, DIspenSing, or Storage
of Materials Not SpeCified
$61 00
5
e
e
Schedule 3 Fire Protection System Fees
The following fees shall be collected commencing July 1, 1992 for the
installation I repair or replacement of the new fire protection systems,
equipment and deVices indicated
1 Fire Protective Signaling Systems
A Local Fire Alarm per control $91 00
unit per deVice $1 50
B Central Station per controll $91 00
communicator,
per device $ 1 50
C VOice Alarm/Hlghrlse
System per control $244 00
unit per deVice $1 50
2 Fire Extinguishing Systems
A Chemical (wet/dry) $61 00
per nozzle or deVice $300
B Halon $91 00
per Halon Control Panel
per nozzle or deVice $3 00
C Carbon DIoxide $61 00
per nozzle or deVice.
per nozzle or deVice $300
3 Fire Sprinkler Systems $61 00
A With no fire pump
per head, riser, connection $200
B With a fire pump
per head, riser, connection $200
6
e
e
Total Pump Capacity
250 gpm
500 g P m
750 gpm
1000 gpm
1250 gpm
1500 gpm
2000 gpm
>2000 gpm
per 1 gal
$87 50
$175 00
$262 50
$350 00
$437 50
$525 00
$700 00
$0 35
C Tenant Improvements - Head Relocation
per head, nser. connection
$ 30 00
$200
o Remodel - Modification of System Piping
per head. fiser, connection
$61 00
$200
4 Standpipe Systems Class I, II or III
New, replace or relocate
$30 00
A Hose Valves, PRV Type per valve
B Hose Valves, Non PRY per valve
$15 00
$ 500
5 Fire Flow Measurement
$61 00
Schedule 4 Flammable. Combustible or Hazardous Matenals Storage
Tanks, Vessels. Piping and Vents
The follOWing fees shall be collected commencing July 1, 1992 for the
installation, repair or replacement of the type of tank, vessel and
associated piping and/or vent shown
1 Above ground Storage
Tank Installation
A First Tank
$183 00
7
e
e
B Each Additional Tank
$30 00
2 Above ground Storage Tank Removal
A Per Tank
$61 00
3 Under ground Storage
Tank Installation
A First Tank
B Each Add ItlO nal Tank
$1 22 00
$61 00
4 Under ground Tank Removal
A Per Tank
$61 00
Schedule 5 - Fire Department Construction Plan Review
The following fees shall be collected commencing July 1, 1992
plan review and field inspection of construction subject to the
Standards of the State Fire Marshal
1 State Fire Marshal Regulated Occupancies
A Minimum charge per hour for
Plan Review (Field Inspection IS
Included In fee) Minimum Charge
IS 1 hour
for the
Building
$61 00
SECTION 2 The hourly cost IS $61 00 per hour and Includes
consultation, administrative work, field inspection and one follow up
inspection for compliance
A third inspection for non-compliance shall be $61 00 plus
additIonal time In one 1/2 hou r Increments ($30 00) after the first hour
Each additional Inspection required due to to non-complIance shall
be at $183 00 per hour plus additional time In one 1/2 hour Increments
($91 00) after the first hour
8
e
e
SECTION 3 The City Clerk shall certify to the adoption of this
resolution and thenceforth and thereafter the same shall be In full force
and effect
APPROVED AS TO FORM
;-4,......f~-;r~... . WV'-~;r.....~"-.....~"'I
. ~ ,
-------------------~---------
Robert M Myers
City Attorney
(subs adm res)
9
e
e
Adopted and approved this 26th day of May, 1992.
.
~
""}l~.. ~
_ -~. .~..... t
Mayor
..
I hereby certify that the foregoing Resolution No. 8408(CCS)
was duly adopted by the City Council of the city of Santa Monica
at a meeting thereof held on May 26, 1992 by the following
council vote:
Ayes:
councilmembers:
Abdo, Genser, Holbrook, Olsen,
Vazquez, Zane
Noes: Councilmembers:
None
Abstain: Councilmembers:
None
Absent: Councilmembers:
Katz
ATTEST:
~ f J/:)J/
./0t~ 6. /l'~ ,U-n~~
~ ~ City Cle,,:,k /