O27831
City Council Meeting: June 25, 2024 Santa Monica, California
ORDINANCE NUMBER 2783 (CCS)
(City Council Series)
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANTA MONICA
AMENDING ARTICLE VIII OF THE SANTA MONICA MUNICIPAL CODE
TO ADOPT LOCAL AMENDMENTS TO THE 2022 CALIFORNIA GREEN BUILDING
STANDARDS CODE RELATING TO ELECTRIC VEHICLE PARKING
REQUIREMENTS FOR NEWLY CONSTRUCTED BUILDINGS
WHEREAS, the California State Building Standards Commission approved and
published the 2022 edition of the California Building Standards Code on July 1, 2022, and
such code became effective on January 1, 2023; and
WHEREAS, the 2022 California Building Standards Code includes the 2022
California Green Building Standards Code; and
WHEREAS the July 2024 Intervening Code Cycle update to the 2022 California
Green Building Standards Code takes effect July 1, 2024; and
WHEREAS, California Health and Safety Code Sections 17958.7 and 18941.5
provide that the City may make changes or modifications to the building standards
contained in the California Building Standards Code based upon express findings that
such changes or modifications are reasonably necessary because of local climatic,
geological, or topographical conditions; and
WHEREAS, Section 101.7.1 of the 2022 California Green Building Standards
Code provides that for the purposes of local amendments to the 2022 California Green
Building Standards Code, local climatic, topographical, or geological conditions include
local environmental conditions as established by the City; and
WHEREAS, at its September 27, 2022 meeting, the Council adopted a resolution
making findings regarding local climatic, geological, topographical, and environmental
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
2
conditions to support certain local amendments to the 2022 California Green Building
Standards Code; and
WHEREAS, at its September 27, 2022 meeting, the Council enacted an ordinance
adopting and making certain local amendments to the 2022 California Green Building
Standards Code; and
WHEREAS, consistent with the City’s May 2019 Climate Action & Adaptation Plan,
the local amendments to the 2022 California Green Building Standards Code
implemented by this ordinance will increase the use of renewable energy and reduce
greenhouse gas emissions; and
WHEREAS, local amendments to the 2022 California Green Building Standards
Code through the 2024 Intervening Code Cycle relating to building electrification and
electric vehicle readiness were the subject of a public stakeholder workshop conducted
on April 4, 2024 at which attendees included architects, energy modelers, designers,
builders, developers, and other local stakeholders; and
WHEREAS, local amendments to the 2022 California Green Building Standards
Code relating to building electrification and electric vehicle readiness were reviewed with
the Commission on Sustainability, Environmental Justice, and the Environment and its
Electric Vehicle Subcommittee at multiple meetings in 2024; and
WHEREAS, at its March 18, 2024 meeting, the Commission on Sustainability,
Environmental Justice, and the Environment determined to recommend that the City
Council adopt the local amendments to the 2022 California Green Building Standards
Code (in accordance with the 2024 Intervening Code Cycle) implemented by this
ordinance; and
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
3
WHEREAS, at its May 14, 2024 meeting, Council formally adopted the 2022
California Green Building Standards Code; and
WHEREAS, once adopted by the City Council, the local amendments to the 2022
California Green Building Standards Code will, in accordance with Health and Safety
Code Section 17958.7, be submitted to the California Building Standards Commission for
filing, and shall become effective 30 days after this submission; and
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA MONICA
DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Purpose
It is the purpose and intent of this Ordinance to adopt local modifications and
changes to the 2022 California Green Building Standards Code (Title 24, Part 11) that
provide local standards for new residential, non-residential, and hotel and motel buildings
that exceed the minimum standards of the 2024 Intervening Code update to the 2022
California Green Building Standards Code reduce greenhouse gas emissions.
SECTION 2. Section 8.106.110 of the Santa Monica Municipal Code are hereby
amended to read as follows:
Section 4.106.4 of the 2022 California Green Building Code and its subsections are
amended to read as follows:
A4.106.8 Electric vehicle (EV) charging for new construction.
New construction shall comply with Section A4.106.8.1 or A4.106.8.2, to facilitate the
installation and use of EV ready spaces. Electric vehicle supply equipment (EVSE) shall
comply with the California Electrical Code.
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
4
A4.106.8.1 New one- and two-family dwellings and townhouses with attached
private garages.
Tier 1 and Tier 2. For each dwelling unit, a dedicated 208/240-volt branch circuit
shall be installed in the raceway required by Section 4.106.4.1. The branch circuit
and associated overcurrent protective device shall be rated at 40 amperes
minimum. Other electrical components, including a receptacle or blank cover,
related to this section shall be installed in accordance with the California Electrical
Code.
A4.106.8.1.1 Identification.
The service panel or subpanel circuit directory shall identify the overcurrent
protective device designated for future EV charging purposes as “EV READY” in
accordance with the California Electrical Code. The receptacle or blank cover shall
be identified as “EV READY.”
A4.106.8.2 New multifamily dwellings, hotels and motels.
New multifamily dwellings, hotels and motels shall meet the following requirements.
A4.106.8.2.1 Multifamily dwellings, hotels and motels
Tier 1. New multifamily projects shall comply with Option A.
Option A for new multifamily dwellings, hotels and motels.
1. EV Ready parking spaces with receptacles.
a. Hotels and motels. Fifty (50) percent of the total number of parking spaces
shall be equipped with low power Level 2 EV charging receptacles.
b. Multifamily parking facilities. Fifty (50) percent of the total number of parking
spaces shall be equipped with low power Level 2 EV charging receptacles.
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
5
EV charging receptacles required by this section shall be located in at least
one assigned parking space per dwelling unit where assigned parking is
provided but need not exceed fifty (50) percent of the total number of
assigned parking spaces provided on the site.
Exceptions:
1. Areas of parking facilities served by parking lifts, including but not limited to
automated mechanical-access open parking garages as defined in the California
Building Code; or parking facilities otherwise incapable of supporting electric
vehicle charging.
2. Hotels and motels may substitute Level 2 EV chargers for some or all of the
required EV charging receptacles. Where Level 2 EV chargers are installed in
place of low power Level 2 receptacles, at least fifty (50) percent of the installed
EV chargers shall be equipped with J1772 connectors.
2. EV Ready parking spaces with EV chargers.
a. Hotels and motels. Fifteen (15) percent of the total number of parking spaces
for hotels and motels shall be equipped with Level 2 EV chargers. At least fifty (50)
percent of the required EV chargers shall be equipped with J1772 connectors.
b. Multifamily parking facilities. Fifteen (15) percent of the total number of parking
spaces shall be equipped with Level 2 EV chargers. At least fifty (50) percent of
the required EV chargers shall be equipped with J1772 connectors. Where
common use parking or unassigned parking is provided, EV chargers shall be
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
6
located in common use or unassigned parking areas and shall be available for use
by all residents or guests.
Exceptions:
1. Areas of parking facilities served by parking lifts, including but not limited to
automated mechanical-access open parking garages as defined in the California
Building Code; or parking facilities otherwise incapable of supporting electric
vehicle charging.
An automatic load management system (ALMS) may be used to reduce the maximum
required electrical capacity to each space served by the ALMS. The electrical system and
any on-site distribution transformers shall have sufficient capacity to deliver at least 3.3
kW simultaneously to each EV charging station (EVCS) served by the ALMS. The branch
circuit shall have a minimum capacity of 40 amperes, and installed EV chargers shall
have a capacity of not less than 30 amperes.
A4.106.8.2.2 Technical requirements. The EV spaces required by Section A4.106.8.2
shall be designed and constructed in accordance with Sections 4.106.4.2,
4.106.4.2.2.1.1, 4.106.4.2.2.1.2, and 4.106.4.2.5.
SECTION 3. Section 8.106.120 of the Santa Monica Municipal Code is hereby
amended as follows:
Section 5.106.5.3 of the 2022 California Green Building Code and its subsections
are amended to read as follows:
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
7
5.106.5.3 Electric vehicle (EV) charging. Construction shall comply with Section
A5.106.5.3.1 Tier 1, and in accordance with regulations in the California Building Code
and the California Electrical Code.
A5.106.5.3.1 Tier 1
Comply with Section 5.106.5.3.1 EV capable spaces, Section 5.106.5.3.2 Electric vehicle
charging stations and associated Table A5.106.5.3.1 Tier 1, or comply with Section
A5.106.5.3.2 Electric vehicle charging stations (EVCS)—Power allocation method and
associated Table A5.106.5.3.2 Tier 1.
Refer to Section 5.106.5.3.2 for the permitted use of Level 2 or Direct Current Fast
Charger (DCFC) to create EVCS. Refer to Section 5.106.3.2.1 for the allowed use of
DCFC to comply with both EV capable spaces and Level 2 EVSE. Refer to Section
5.106.5.3.3 for the allowed use of Automatic Load Management System (ALMS).
Table A5.106.5.3.1
TOTAL NUMBER OF
ACTUAL PARKING
SPACES
TIER 1 NUMBER OF
REQUIRED EV
CAPABLE SPACES
TIER 1 NUMBER OF EVCS
(EV CAPABLE SPACES
PROVIDED WITH EVSE)2
0-9 2 0
10-25 5 2
26-50 11 4
51-75 19 5
76-100 26 9
101-150 38 13
151-200 53 18
201 and over 30 percent of actual
parking spaces1
33 percent of EV capable
spaces 1
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
8
Table A5.106.5.3.1
TOTAL NUMBER OF
ACTUAL PARKING
SPACES
TIER 1 NUMBER OF
REQUIRED EV
CAPABLE SPACES
TIER 1 NUMBER OF EVCS
(EV CAPABLE SPACES
PROVIDED WITH EVSE)2
1. Calculation for spaces shall be rounded up to the nearest whole number.
2. The number of required EVCS (EV capable spaces provided with EVSE) in column 3 count
toward the total number of required EV capable spaces shown in column 2.
3. At least one Level 2 EVSE shall be provided.
A5.106.5.3.2 Electric vehicle charging stations (EVCS) – Power Allocation method.
The power allocation method may be used as an alternative to the requirements in
Section 5.106.5.3.1, Section 5.106.5.3.2, and associated Table A5.106.5.3.1 Tier 1. Use
Table A5.106.5.3.2 Tier 1 to determine the total power in kVA required based on the
total number of actual parking spaces.
Power allocation method shall include the following:
1.Use any kVA combination of EV capable spaces, low power Level 2,
Level 2 or DCFC EVSEs.
2.At least one Level 2 EVSE shall be provided.
TABLE A5.106.5.3.2 Tier 1
TOTAL NUMBER
OFACTUAL
PARKINGSPACES
MINIMUMTOTAL
kVA@ 6.6 kVA
TOTAL kVA REQUIREDIN ANY
COMBINATION OF EVCAPABLE3,4,
LOW POWER LEVEL 2LEVEL 21, 2, OR
DCFC
0–9 13.2 13.2
10–25 33 33
26–50 72.6 72.6
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
9
51–75 125.4 125.4
76–100 171.6 171.6
101–150 250.8 250.8
151–200 349.8 349.8
201 and over 30 percent of actual
parking spaces × 6.6
Total required kVA = P × .30 × 6.6 Where
P = Parking spaces in facility
1. Level 2 EVSE @ 6.6 kVA minimum.
2. At least one Level 2 EVSE shall be provided.
3. Maximum allowed kVA to be utilized for EV capable spaces is 67 percent.
4. If EV capable spaces are utilized, they shall meet the requirements of Section 5.106.5.3.1 EV capable spaces.
5.106.5.3.3 Use of automatic load management systems (ALMS). ALMS shall be
permitted for EVCS. When ALMS is installed, the required electrical load capacity
specified in Section 5.106.5.3.1 for each EVCS may be reduced when serviced by an
EVSE controlled by an ALMS. Each EVSE controlled by an ALMS shall deliver a minimum
30 amperes to an EV when charging one vehicle and shall deliver a minimum 3.3 kW
while simultaneously charging multiple EVs.
5.106.5.3.4 Accessible electric vehicle charging station (EVCS). When EVSE is
installed, accessible EVCS shall be provided in accordance with the California Building
Code Chapter 11B Section 11B-228.3.
Note: 5.106.5.3.5 Electric vehicle charging station signage. For EVCS signs, refer to
Electric vehicle charging stations shall be identified by signage or pavement markings in
compliance with Caltrans Traffic Operations Policy Directive 13-01 (Zero Emission
Vehicle Signs and Pavement Markings) or its successor(s).
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
10
5.106.5.3.5.1 Additional EV Ready Requirement for office facilities. In addition to the
requirements of Table A5.106.5.3.1, for office parking facilities, an additional 20%
(rounded to the nearest whole number) of the total number of parking spaces shall be
equipped with low power Level 2 EV charging receptacles.
5.106.5.4 Additions or alterations to existing buildings or parking facilities [A].
[BSC-CG] Existing buildings or parking facilities being modified by one of the following
shall comply with Section 5.106.5.4.1 or 5.106.5.4.2. When EVSE is installed, accessible
EVCS shall be provided in accordance with the California Building Code, Chapter 11B,
Section 11B-228.3.
1. When the scope of construction work includes an increase in power
supply to an electric service panel as part of a parking facility addition or
alteration.
2. When a new photovoltaic system is installed covering existing parking
spaces.
3. When additions or alterations to existing buildings are triggered pursuant
to code Section 301.3 and the scope of work includes an increase in power
supply to an electric service panel.
Exceptions:
1.On a case-by-case basis where the local enforcing agency has determined compliance
with this section is not feasible based upon one of the following conditions:
a. Where there is no local utility power supply.
b. Where the local utility is unable to supply adequate power.
c. Where there is evidence suitable to the local enforcement agency substantiating
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
11
that additional local utility infrastructure design requirements, directly related to the
implementation of Section 5.106.5.3, may adversely impact the construction cost
of the project.
d. Where demonstrated as impracticable excluding local utility service or utility
infrastructure issues.
2. Remote parking facilities that do not have access to the building service panel.
3. Parking area lighting upgrades where no trenching is part of the scope of work.
4.Emergency repairs, including but not limited to water line break in parking facilities,
natural disaster repairs, etc.
5.106.5.4.1 Existing buildings or parking areas without previously installed EV
capable infrastructure [A].
When EV capable infrastructure does not exist at an existing parking facility or building,
and the parking facility or building undergoes an addition or alteration listed in Section
5.106.5.4, construction shall include electric vehicle charging in compliance with either
Section 5.106.5.3 and associated Table 5.106.5.3.1, or Section 5.106.5.3.6 and
associated Table 5.106.5.3.6 for the total number of actual parking spaces being added
or altered.
5.106.5.4.2 Existing buildings or parking areas with previously installed EV capable
infrastructure [A].
When EV capable infrastructure is available at an existing parking facility or building, and
the parking facility or building is undergoing an addition or alteration listed in Section
5.106.5.4, construction shall include electric vehicle charging in compliance with either
Section 5.106.5.3 and associated Table 5.106.5.3.1, or Section 5.106.5.3.6 and
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
12
associated Table 5.106.5.3.6 utilizing the existing EV capable allocated power and
infrastructure for the total number of actual parking spaces being added or altered. If the
area being added or altered exceeds the existing EV capable capacity, allocated power
and infrastructure, provide additional EV charging as needed to comply with this section.
5.106.5.4.5 Electric vehicle (EV) charging: medium-duty and heavy-duty. [N] [BSG-
CG] Construction shall comply with Section 5.106.5.4.1 to facilitate future installation of
electric vehicle supply equipment (EVSE). Construction for warehouses, grocery stores
and retail stores with planned off-street loading spaces shall also comply with Section
5.106.5.4.5.1 for future installation of medium- and heavy-duty EVSE.
Exceptions:
1. On a case-by-case basis where the local enforcing agency has determined compliance
with this section is not feasible based upon one of the following conditions:
a. Where there is no local utility power supply.
b. Where the local utility is unable to supply adequate power.
c. Where there is evidence suitable to the local enforcing agency substantiating that
additional local utility infrastructure design requirements, directly related to the
implementation of Section 5.106.5.3, may adversely impact the construction cost of
the project.
When EVSE(s) is/are installed, it shall be in accordance with the California Building
Code, the California Electrical Code and as follows:
5.106.5.4.5.1 Electric vehicle charging readiness requirements for warehouses,
grocery stores and retail stores with planned off-street loading spaces. In order to
avoid future demolition when adding EV supply and distribution equipment, spare
raceway(s) or busway(s) and adequate capacity for transformer(s), service panel(s) or
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
13
subpanel(s) shall be installed at the time of construction in accordance with the California
Electrical Code. Construction plans and specifications shall include, but are not limited to,
the following:
1. The transformer, main service equipment and subpanels shall meet
the minimum power requirement in Table 5.106.5.4.1.5.1 to
accommodate the dedicated branch circuits for the future installation
of EVSE.
2. The construction documents shall indicate one or more location(s)
convenient to the planned off-street loading space(s) reserved for
medium- and heavy-duty ZEV charging cabinets and charging
dispensers, and a pathway reserved for routing of conduit from the
termination of the raceway(s) or busway(s) to the charging cabinet(s)
and dispenser(s), as shown in Table 5.106.5.4.5.1.
3. Raceway(s) or busway(s) originating at a main service panel or a
subpanel(s) serving the area where potential future medium- and
heavy-duty EVSE will be located, and shall terminate in close
proximity to the potential future location of the charging equipment
for medium- and heavy-duty vehicles.
4. The raceway(s) or busway(s) shall be of sufficient size to carry the
minimum additional system load to the future location of the charging
for medium- and heavy-duty ZEVs as shown in Table 5.106.5.4.5.1.
TABLE 5.106.5.4.5.1
RACEWAY CONDUIT AND PANEL POWER REQUIREMENTS FOR MEDIUM-
AND HEAVY-DUTY EVSE [N]
Building type
Building
Size
(sq. ft.)
Number of Off-
street loading
spaces
Additional capacity Required
(kVa) for Raceway & Busway
and Transformer & Panel
Grocery 1 or 2 200
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
14
10,000 to
90,000
3 or Greater 400
Greater than
90,000
1 or Greater 400
Manufacturing
Facilities
10,000 to
50,000
1 or 2 200
10,000 to
50,000
3 or Greater 400
Greater than
50,000
1 or Greater 400
Office
Buildings
10,000 to
135,000
1 or 2 200
10,000 to
135,000
3 or Greater 400
Greater than
135,000
1 or Greater 400
Retail 10,000 to
135,000
1 or 2 200
3 or Greater 400
Greater than
135,000
1 or Greater 400
Warehouse 20,000 to
256,000
1 or 2 200
3 or Greater 400
Greater than
256,000
1 or Greater 400
5.106.5.6 Electric vehicle (EV) charging at public schools and community colleges.
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
15
[DSA-SS] Electric vehicle infrastructure and electric vehicle charging stations shall
comply with Section 5.106.5.6 and shall be provided in accordance with regulations in the
California Building Code and the California Electrical Code.
Exceptions:
1.On a case-by-case basis where compliance with this section has been
demonstrated to be not feasible based upon one of the following conditions, and with
concurrence by the Division of the State Architect (DSA), compliance with Section
5.106.5.6 shall not be required.
a. Where there is no local utility power supply.
b. Where the local utility is unable to supply adequate power.
c. The installation of EVCS is impracticable.
2. Parking spaces accessible only by automated mechanical car parking systems are
not required to comply with Section 5.106.5.6.
5.106.5.6.1 EV capable spaces.
EV capable spaces shall be provided in accordance with Table A5.106.5.6.1 and the
following requirements:
1. Raceways complying with the California Electrical Code and no less than 1-inch
(25 mm) diameter shall be provided and shall originate at a service panel or a
subpanel(s) serving the area and shall terminate in close proximity to the proposed
location of the EV capable space and into a suitable listed cabinet, box, enclosure or
equivalent. A common raceway may be used to serve multiple EV capable spaces.
2. A service panel or subpanel(s) shall be provided with panel space and electrical
load capacity for a dedicated 208/240 volt, 40-ampere minimum branch circuit for each
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
16
EV capable space, with delivery of 30-ampere minimum to an installed EVSE at each
EVCS.
3. The electrical system and any on-site distribution transformers shall have sufficient
capacity to supply full rated amperage at each EV capable space.
4. The service panel or subpanel circuit directory shall identify the reserved
overcurrent protective device space(s) as “EV CAPABLE.” The raceway termination
location shall be permanently and visibly marked as “EV CAPABLE.”
5.106.5.6.2 Electric vehicle charging stations (EVCS).
EV capable spaces shall be provided with EVSE to create EVCS in the number indicated
in Table 5.106.5.6.1 and shall comply with Section 5.106.5.6.2. EVCS shall be serviced
by Level 2 or Direct Current Fast Charging (DCFC) EVSE, or with EVSE in any
combination of Level 2 and DCFC. Accessible EVCS shall be provided in accordance
with California Building Code Chapter 11B.
5.106.5.6.2.1 Reduced number of EV capable spaces.
The installation of each DCFC EVSE shall be permitted to reduce the minimum
number of required EV capable spaces indicated in Table 5.106.5.6.1 by five and
reduce proportionally the required electrical load capacity to the service panel or
subpanel.
5.106.5.6.2.2 Multiple connectors.
EVSE with multiple vehicle connectors capable of charging multiple EVs
simultaneously shall be permitted if the electrical load capacity required by Section
5.106.5.6.1 for each EV capable space is accumulatively supplied to the EVSE.
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
17
5.106.5.6.2.3 Use of automatic load management systems (ALMS).
ALMS shall be permitted for EVCS installed in accordance with Section
5.106.5.6.2. When ALMS is installed, the required electrical load capacity specified
in Section 5.106.5.6.1 for each EVCS may be reduced when serviced by an EVSE
controlled by an ALMS. Each EVSE controlled by an ALMS shall deliver a
minimum 30 amperes to an EV when charging one vehicle and shall deliver a
minimum 3.3 kW while simultaneously charging multiple EVs.
5.106.5.6.3 EVCS alternative compliance.
In lieu of compliance with Section 5.106.5.6.2, EVCS shall be provided with Level 1, low
power Level 2, or Level 2, or any combination of Level 1, low power Level 2 or Level 2
EVSE such that the total power supplied by the combination of EVSE meets the minimum
power indicated in Table 5.106.5.6.3, based on the total number of actual parking spaces
in each parking facility.
TABLE 5.106.5.6.3
NUMBER OF PARKING
SPACESIN A PARKING
FACILITY
MINIMUM TOTAL POWER
(KVA)REQUIRED FOR EVCS
0–9 0
10–25 7
26–50 14
51–75 20
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
18
76–100 27
101–150 40
151–200 60
201 and over
Total required KVA = P × .05 ×
6.6Where P = Parking spaces
in facility
5.106.5.6.4 EVCS for alterations of or additions to parking facilities.
Alterations of or additions to parking facilities shall provide EVCS in compliance with
Section 5.106.5.6.4. The installation of infrastructure for EV capable spaces required to
be provided without EVSE shall not be required.
5.106.5.6.4.1 Alterations of and additions to parking facilities.
EVCS shall be provided in accordance with the number indicated in Table
5.106.5.6.1 or minimum power indicated in Table 5.106.5.6.3 when the scope of
work includes an increase in power supply to an electric panel serving light fixtures
illuminating the parking area or when area containing parking spaces is added to
a parking facility. The number of required EVCS shall be based on the total number
of existing and new parking spaces in the parking facility.
5.106.5.6.4.2 Alterations consisting of the installation of photovoltaic
systems.
EVCS shall be provided in accordance with the number indicated in Table
5.106.5.6.1 or maximum power indicated in Table 5.106.5.6.3 when a new
photovoltaic system is installed in an existing parking facility.
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
19
5.106.5.6.5 Requirement to install EVSE.
Level 2 EVSE shall be provided in all existing EV capable spaces to create EVCS when
a project is required by California Administrative Code Section 4-309 to be submitted for
plan approval to the Division of the State Architect. When EVSE is installed in existing EV
capable spaces, accessible EVCS shall be provided in accordance with California
Building Code Chapter 11B.
Exception: Projects in which improvements in parking areas consist only of
accessibility improvements are not required to comply with Section 5.106.5.6.5.
SECTION 4. Any provision of the Santa Monica Municipal Code or appendices
thereto inconsistent with the provisions of this Ordinance, to the extent of such
inconsistencies and no further, is hereby repealed or modified to that extent necessary to
effect the provisions of this Ordinance. Underlines and strikethroughs have been
intentionally left in and must be published in underline and strikethrough form.
SECTION 5. If any section, subsection, sentence, clause or phrase of this
Ordinance is for any reason held to be invalid or unconstitutional by a decision of any
court of competent jurisdiction, such decision shall not affect the validity of the remaining
portions of this Ordinance. The City Council hereby declares that it would have passed
this Ordinance and each and every section, subsection, sentence, clause, or phrase not
declared invalid or unconstitutional without regard to whether any portion of the ordinance
would be subsequently declared invalid or unconstitutional.
SECTION 6. The Mayor shall sign and the City Clerk shall attest to the passage of
the Ordinance. The City Clerk shall cause the same to be published once in the official
newspaper within 15 days after its adoption. Following its adoption, this Ordinance shall
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
20
be submitted to the California Building Standards Commission for filing. This Ordinance
shall become effective 30 days after submission to the California Building Standards
Commission. Building permit applications submitted on or after the effective date of this
Ordinance shall be required to comply with the requirements set forth herein.
APPROVED AS TO FORM:
________________________
Douglas Sloan, City Attorney
DocuSign Envelope ID: DF07F05C-C234-4BCC-8BDC-9F150F3A419D
Approved and adopted this 25th day of June, 2024.
_____________________________
Phil Brock, Mayor
State of California )
County of Los Angeles ) ss.
City of Santa Monica )
I, Nikima S. Newsome, Interim City Clerk of the City of Santa Monica, do
hereby certify that the foregoing Ordinance No. 2783 (CCS) had its introduction
on June 11, 2024, and was adopted at the Santa Monica City Council meeting
held on June 25, 2024, by the following vote:
AYES: Councilmembers de la Torre, Torosis, Davis, Parra, Zwick,
Mayor Brock, Mayor Pro Tem Negrete
NOES: None
ABSENT: None
ATTEST:
_____________________________________ _________________
Nikima S. Newsome, Interim City Clerk Date
A summary of Ordinance No. 2783 (CCS) was duly published pursuant to
California Government Code Section 40806.