SR-01-22-2013-3MCity Council Meeting: January 22, 2013
Agenda Item: L
To: Mayor and City Council
From: Martin Pastucha, Director of Public Works
Subject: Construction Contract for the Arcadia Reservoir Roof Repair Project
Recommended Action
Staff recommends that the City Council:
1. Authorize the City Manager to negotiate and execute a construction contract with
Mallcraft, Inc. a California based company, in an amount not to exceed
$1,513,000 (including a 10% contingency) for the Arcadia Reservoir Roof Repair
Project.
2. Authorize the Director of Public Works to issue any necessary change orders to
complete additional work within contract authority.
Executive Summary
Arcadia Reservoir is a 5- million gallon potable water storage reservoir located at the
Santa Monica Water Treatment Facility. The roof system covering the reservoir has
deteriorated and requires repair and maintenance. The project would involve repair of
the damaged roof framing, installation of a steel access platform over the roof to protect
the roof from the weight of workers and equipment during future maintenance, and
installation of a waterproof roofing material over the existing aluminum roof. Staff
recommends Mallcraft, Inc., for the construction of this project in an amount not to
exceed $1,513,000.
Background
The Arcadia Reservoir, located at Bundy and Wilshire Boulevards in West Los Angeles,
was constructed in 1924. In the early 1980s, the reservoir's wood roof was completely
replaced with new timber framing and an aluminum roof to seal the reservoir. In the
early 1990s, the roof structure was modified to accommodate the installation of aeration
equipment and maintenance access hatches.
1
Discussion
The Water Resources Division operates and maintains an extensive water production
and distribution network. The Arcadia Reservoir, located at the Santa Monica Water
Treatment Facility, stores 5- million gallons of potable water that is produced by the
treatment facility. In 2008, staff saw that the reservoir roof structure was deteriorating at
several locations. A detailed inspection of the Arcadia Reservoir Roof was conducted
by an engineering and roofing consultant. The inspection report identified damage to
the wood framing that supports the aluminum roof at several locations. A structural
engineer was retained in 2009 to prepare bid documents for the repair of the damaged
roof framing, fabrication of a maintenance access platform, and installation of a
waterproof roofing membrane over the existing aluminum roof.
Contractor Selection
In September 2012, the City published Notices Inviting Bids for the Arcadia Roof Repair
Project. The bid was posted in the Santa Monica Daily Press and on the City's online
bidding site in accordance with the City Charter and Municipal Code provisions. Thirty -
seven prospective contractors requested bid packages. The City Clerk's Office
received three sealed bids, which were publicly opened by the Deputy City Clerk on
October 17, 2012. Bid results are as follows;
Bidder
1. California Averland Construction, Inc.
2. Mallcraft, Inc.
3. Orian Construction & Roofing, Inc.
Engineer's Estimate
Bid Amount
With Contingency
$ 1,279,100
$
1,407,000
$ 1,375,034
$
1,513,000
$ 1,446,544
$
1,592,000
$ 1,453,860
$
1,600,000
Bids were evaluated based on competitive pricing, qualifications, direct experience and
performance on similar projects, and availability and experience of staff to perform the
work. References listed by contractors were contacted to ascertain past performance
on similar projects.
K,
Staff recommends Mallcraft, Inc. as the best bidder based on its price, quality of
services presented, experience with similar projects, including experience with relevant
structural steel framing, and experience of key staff members. Mallcraft, Inc. has
recently completed projects for the cities of West Covina and Los Angeles, and the
State of California. References listed in the bid package were contacted and all
respondents reported that work performed by Mallcraft, Inc. was completed in a timely
and cost - effective manner while maintaining consistent quality. Staff also verified with
the California Contractors State License Board that Mallcraft, Inc. and its
subcontractors' licenses are current, active, and in good standing.
The lowest monetary bidder, California Averland Construction, Inc. was deemed non-
responsive for failing to meet the requirement of self - performance in excess of 50% of
the work per the specifications and for the absence of relevant structural steel framing
experience, which is desired to assure quality performance on the most essential
element of the project.
The City has received the two attached objections by the highest monetary bidder,
Orian Construction & Roofing, Inc ( Orian) (Attachments 1 and 2). The City has sent a
response letter to the corporation's president addressing these issues and the response
letter is also attached to this staff report (Attachment 3).
One of Orian's objections was the absence of a compact disk (CD) version of Mallcraft,
Inc.'s and California Averland Construction, Inc.'s submitted bids. The purpose of the
City's request for a CD is to move towards electronic submittals; however, because a
typed hard copy of the bid was received, and the CD was not necessary to review the
bid, its absence is considered a minor irregularity. Per the posted Instructions to
Bidders, the City has the "right to waive any minor irregularity or informality in any bid."
A second point of objection by Orian was that Mallcraft failed to list a major
subcontractor for installation of structural steel. Mallcraft is self - performing this item of
work, and therefore no structural -steel sub - contractor is listed on Mallcraft's bid form.
3
The City utilizes the best bidder criteria set forth in SMMC Section 2.24.072 in the
recommendation and award of the bid. Mallcraft is the best bidder based on their price,
quality of services presented, experience with relevant structural steel framing, and the
experience of key staff members.
Construction Management and Inspection
Construction management for this project would be provided by staff from the Public
Works Department. Construction management would include inspecting the
contractor's work during construction, verifying and controlling field changes and
unforeseen conditions, monitoring and mitigating impacts as a result of the construction
activities, attending contractor's safety meetings, attending periodic progress meetings,
and maintaining all necessary inspection documentation relevant to the work performed
during construction.
Financial Impacts & Budget Actions
The construction contract to be awarded to Mallcraft, Inc. is for an amount not to exceed
$1,513,000 (including a 10% contingency). Funds are available in the FY2012 -13
Capital Improvement Program budget in account C250973.589000.
Prepared by: Jessica Arden, Civil Engineering Associate
Approved:
Forwarded to Council:
}
Martin Pastucha Rod Gould
Director of Public Works City Manager
Attachments:
1. Orian Email, 10/29/2012
2. Orian Letter, 11/01/2012
3. City of Santa Monica Letter, 01/04/2013
El
Attachment 1
Office - Orian Construction and Roofing
From: Office - Orian Construction and Roofing < office @oriancr.com>
Sent: Monday, October 29, 2012 5:08 PM
To: 'Jessica Arden'
Subject: Ground for Potential Protests for Arcadia Reservoir Roof Repair Bid
Importance: High
Dear Ms, Arden,
First of all, I would like to thank you for the pleasant phone conversation we had last week regarding the Arcadia
Reservoir Roof Repair project and requested me to email you the nature of my potential protest. As per bid document
Section 3 regarding the submission of Electronic bid, the common practice of public bid is most subcontractors /suppliers
will submit their quotation at the last minute simply because it will enable bid shopping by the prime bidder in favor of a
subcontractor /supplier.
However, as per bid document, Section 3 (Electronic Bid) it clearly states that the "BID SUBMITTAL MUST INCLUDE ONE
(1) ORIGINAL AND ONE (1) ELECTRONIC BID ON CD. EACH BID MUST BE IN A SEALED ENVELOPE AND SHOULD CLEARLY
IDENTIFY THE PROJECT NAME ". In short, we can prove that If we had the freedom to change prices and change
subcontractors we would be able to do so. When we submitted our price, Orian Construction and Roofing Inc. had no
choice and no other alternative to change the bid per last minute quotation, while California Averland and Mallcraft
submitted their bid without the Electronic bid so therefore, they had the advantage of inserting their quote up to the
last minute of bid submission.
We would be more than happy to provide documentation of the price change from our supplier if requested. The point
is, if we did not have the electronic bid (as required) we would be able to change our price per last minute quotation.
Our price would be calculated lower than California Averland and Mallcraft.
Secondly, Mallcraft failed to submit the electronic bid and failed to list a major subcontractor (Structural Steel) while
California Averland Construction failed to submit electronic bid as per Section 3. Also, in the bid breakdown of California
Averland Construction for Structural Steel, they only listed $ 92,000 when in fact, the structural and grating exceeds $
500,000. 1 also suggest to look into California Averland Construction response on Item M, page BF -16 of the bid
document where it was asked, "Has any "owner" (Including a public agency owner) ever terminated a contract with
your firm prior to completion of this project and their response was, "The City of Santa Monica terminated their
contract ".
The reason for the informal protest is to save time and for you to move forward with the project and with the reasons
mentioned above, we request if you can look into it and find Orian Construction the lowest responsive bidder. Upon
request, we will submit the document to prove that the total bid of Orian Construction and Roofing Inc. would have
been the lowest and most responsive bidder.
Lastly, we would like to know the timetable for the award of this job in case we need to file the formal protest
Please feel free to call our office for any clarifications or any questions you may have.
Thank you.
Sion Shabo
Project Manager
Attachment 2
ORIAN CONSTRUCTION AND ROOFING INC
23123 Ventura Blvd., Suite 209, Woodland Hills, CA 91364
Tel No: (818) 224 -3350 • Fax No: (818) 223 -9797 • Email: office@oi-iaiier.com
oriancr.com
License #: 792951
November 1, 2012
Ms. Jessica Arden
City of Santa Monica
Dear Ms. Arden,
We are still waiting for your response to our email sent last Monday, Oct. 29 which you
acknowledged by calling our office. We requested from you the timetable for announcing the
recommendation to award the Arcadia Reservoir Roof Repair project. This date is very crucial to
us as it reserves our right to protest and as stated in the specifications, it only allows 7 days from
the announcement of award.
We are also waiting for your response when you called our office that you are going to disqualify
California Averland Construction for the reason of non - performance of more than 50% as per
specs and the City of Santa Monica Charter. You also mentioned that you will recommend
Mallcraft as the lowest responsive bidder and that you are disqualifying Orian Construction and
Roofing Inc. as Orian Construction and Roofing Inc. also is not performing 50% work.
We respectfully disagree with your findings for the following reasons:
1. Mallcraft failed to submit their electronic bid
2. Mallcraft failed to list a major subcontractor (Structural Steel and Grating) which is way over
$ 600,000. While Mallcraft in his bid breakdown inserted the price for the structural steel for
$693,220.00 he still failed to enlist a major subcontractor for that portion of work in the
Designation of Subcontractors and Supplier list (Form BF -5) of the bid document . The
conclusion of Mallcraft bid just the structural steel is more than 50% of the total bid (for
Subcontractor work)
3. Mallcraft's Roofing subcontractor price of $327,600 (Listed Subcontractor)
4. Mallcraft listed Rough Carpentry Subcontractor amounting to $ 148,904.00
As an answer to your statement that Mallcraft will perform more than 50% of the work is totally off
track. Mallcraft bid tabulation shows:
1. Structural Steel - $ 693,220 (non - listed subcontractor)
2. Rough Carpentry (Golden State subcontractor) - $ 148,904
3. Roofing (Eberhard subcontractor) - $ 327,600
Total amount for Subcontractor bid is: $ 1,169,724
Grand total of Mallcraft bid is $ 1,375,034 less subcontractor bid of $ 1,169,724 so the total
Mallcraft work will bring you only $205,310 which is below 15% when it requires the Prime
Contractor to self- perform work more than 50 %. Please note that Mallcraft also failed to list the
major steel subcontractor for the amount of $ 693,220.
As for Orian Construction and Roofing Inc. we totally disagree with your statement that we are not
self - performing more than 50 %. We already proved that Orian Construction and Roofing Inc. is
the lowest responsive bidder by submitting the electronic bid and all other bid requirements and
that Orian Construction and Roofing Inc. is also self - performing work more than 50% as showed in
the total bid of $ 1,446,544 as we are self - performing the Roof work amounting to $ 550,000 under
our own license. The only subcontractor involved on this job is the Structural Steel which is listed
for the amount of $ 516,414. If you subtract the Structural Steel subcontractor work of $ 516,414
from the grand total bid of $ 1,446,544, it will give you a total of $ 930,130. The total dollar value
of Orian Construction for self - performance work is way above 64 %.
We strongly feel that Orian Construction submitted the perfect bid and calculation for the Arcadia
Roof Repair project. As such, we hope this information and calculation will help you to have a clear
picture of the whole bid. Rest assured, Orian Construction and Roofing Inc. will provide high
quality and professional service for this project. Attached is a copy of Orian Construction and
Mallcraft Bid form BF -5.
Thank you.
Josef Sayas
President
Bidder's Name! orian Construction and Roofing Inc. (enter on each bid form page)
CSI
Div
No
Trade
Subeontlactor(Suppiier
Name, P40fie, &
Man" No "
Address
Portion of
Work (0611ar
amdunt)
0500
Structural
Steel
C A Suchen Corp.(Subcon)
(818)767 -5408
License #209850
9231 Glenoaks Blvd,
Sun Valley, CA
91352
-
$ 516,414.00
Grating
Supplier
Grating Products Inc.
(503) 597 -4190
18129 SW Upper
Boones Ferry Road
Portland, OR 97224
80,000.00
Roofing /Bldg,
Supplier
JS Roofing & Building
Supplies, Inc.
(800) 464 -2461
P.O. Box 5289
Chatsworth, CA
91317
250,000.00
Bolts /Epoxy
Supplier
Hllb
(800) 879 -8000
5400 South 122nd
East Avenue, Tulsa
OK, 74146
5,000.00
raming/
nchor Supplier
Arrow Tools, Fasteners
& Saw Inc.
(818) 780 -1464
7635 Burnet Ave.
Van Nuys, CA
91405
2,000.00
i
T
Public Works I Bid Form Construction I Rev 01111 BF -5
Public Works I Bid Form Construction I Rev 01111 BF -5
F
_r
i
15220 Raymer St.
i
:7'
`Roofing -
$18782 -4604 , - -
Van Nuys, CA 91405
$297,818 '
329087
�Idder s Name: Mallcraft Inc. -
' (enter on ech tied FOrm page;
oldan.Slate framers
610 S. Jefferson St. PI,
CSI
Trade
14-524 -9500
S koniriddr /SOOpHer.
- Addrasg,,"
Portipn of
Riv
iihYe,!?hane, &.'r
�!Vcck {dollar;
No
Licensd�ltl,
j
" s' 1
arnirunt}
Public Works I Bid Form Construction I Rev 01111 BF -5
F
Eberhard
15220 Raymer St.
:7'
`Roofing -
$18782 -4604 , - -
Van Nuys, CA 91405
$297,818 '
329087
oldan.Slate framers
610 S. Jefferson St. PI,
6
Rough Carpentry
14-524 -9500
Placentia, CA 92870
$96'408
Public Works I Bid Form Construction I Rev 01111 BF -5
Attachment 3
ary or
Santa nlonicn°
January 4, 2013
City of Santa Monica
Department of Public Works
Office of the City Engineer
1437 4th St., Suite 300
Santa Monica, CA 90401
Josef Sayas, President
Orian Construction & Roofing Inc.
23123 Ventura Blvd., Suite 209
Woodland Hills, CA 91364
Subject: Award of Arcadia Reservoir Roof Repair Project
Dear Mr. Sayas,
The City received your enclosed communication dated October 29, 2012 and November 1, 2012.
We have reviewed this information and the three bids received on the project and plan to
recommend award of the project to Mallcraft as the best bidder at the January 22, 2013 City
Council meeting.
Regarding Paragraph 3, Item 1 of your November 1, 2012 letter, City staff considersthe absence of
an electronic bid as a minor exclusion. The purpose of the City's request for a CD is to move
towards electronic submittals; however, because a hard copy of the bid was received and the CD
was not necessaryto reviewthe bid, its absence is considered a minor irregularity. Perthe posted
Instructions to Bidders, the City has the "right to waive any minor irregularity or informality in any
bid.,,
Regarding Paragraph 3, Item 2 of your November 1, 2012 letter, when self- performing an item of
work, no sub - contractor listing is necessary on the Bid Form. Mallcraft is self - performing this item
of work, and therefore there is no sub - contractor to list on Mallcraft's bid form for this bid item.
The suppliers listed by Orion Construction and Roofing Inc. (Orion) do not count as part of the work
that is being performed by others; therefore, Orion does meet the 50% self - performance bid
requirement.
This item was placed on the January 8, 2013 City Council agenda, but this item will be continued to
the January 22, 2013 City Council agenda as we had intended to provide you with more notice
prior to the meeting date.
1 -4 -13 Letter to Orian Construction
& Roofing Company
Page 2 of 2
Thank you for your interest in this matter. Please contact me at (310) 458 -8730 if you have any
questions.
Best regards,
.,5 ;Z
Lee Swain, P.E.
City Engineer
Enclosures:
1. Email from Orian Construction and Roofing dated 10 -29 -12
2. Letter from Orian Construction and Roofing dated 11 -1 -12
c: Martin Pastucha, Director of Public Works
Mark Cuneo, Principal Engineer
Jessica Arden, Project Manager
Office - Orian Construction and Roofing
From: Office - Orian Construction and Roofing <office @oriancr.com>
Sent: Monday, October 29, 2012 5:08 PM
To: 'Jessica Arden'
Subject: Ground for Potential Protests for Arcadia Reservoir Roof Repair Bid
Importance: High
Dear Ms. Arden,
First of all, I would like to thank you for the pleasant phone conversation we had last week regarding the Arcadia
Reservoir Roof Repair project and requested me to email you the nature of my potential protest. As per bid document
Section 3 regarding the submission of Electronic bid, the common practice of public bid is most subcontractors /suppliers
will submit their quotation at the last minute simply because it will enable bid shopping by the prime bidder in favor of a
subcontractor /supplier.
However, as per bid document, Section 3 (Electronic Bid) It clearly states that the "BID SUBMITTAL MUST INCLUDE ONE
(1) ORIGINAL AND ONE (1) ELECTRONIC BID ON CO. EACH BID MUST BE IN A SEALED ENVELOPE AND SHOULD CLEARLY
IDENTIFY THE PROJECT NAME ". In short, we can prove that if we had the freedom to change prices and change
subcontractors we would be able to do so. When we submitted our price, Orian Construction and Roofing Inc. had no
choice and no other alternative to change the bid per last minute quotation, while California Averland and Mallcraft
submitted their bid without the Electronic bid so therefore, they had the advantage of inserting their quote up to the
last minute of bid submission.
We would be more than happy to provide documentation of the price change from our supplier if requested. The point
is, if we did not have the electronic bid (as required) we would be able to change our price per last minute quotation.
Our price would be calculated lower than California Averland and Mallcraft.
Secondly, Mallcraft failed to submit the electronic bid and failed to list a major subcontractor (Structural Steel) while
California Averland Construction failed to submit electronic bid as per Section 3. Also, in the bid breakdown of California
Averland Construction for Structural Steel, they only listed $ 92,000 when in fact, the structural and grating exceeds $
500,000. 1 also suggest to look into California Averland Construction response on Item M, page BF -16 of the bid
document where it was asked, "Has any "owner" (including a public agency owner) ever terminated a contract with
your firm prior to completion of this project and their response was, "The City of Santa Monica terminated their
contract ".
The reason for the informal protest is to save time and for you to move forward with the project and with the reasons
mentioned above, we request if you can look into It and find Orian Construction the lowest responsive bidder. Upon
request, we will submit the document to prove that the total bid of Orian Construction and Roofing Inc. would have
been the lowest and most responsive bidder.
Lastly, we would like to know the timetable for the award of this job in case we need to file the formal protest.
Please feel free to call our office for any clarifications or any questions you may have.
Thank you.
Sion Shabo
Project Manager
ORIAN CONSTRUCTION AND ROOFING INC.
23123 Ventura Blvd., Suite 209, woodland I- lilts, CA 91364
Tel No: (8 18) 224 -3350 • Fax No: (818) 223 -9797 - Email: office@oriancr.com
License t 792951
November 1, 2012
Ms. Jessica Arden
City of Santa Monica
Dear Ms. Arden,
We are still waiting for your response to our email sent last Monday, Oct. 29 which you
acknowledged by calling our office. We requested from you the timetable for announcing the
recommendation to award the Arcadia Reservoir Roof Repair project. This date is very crucial to
us as it reserves our right to protest and as stated in the specifications, it only allows 7 days from
the announcement of award,
We are also waiting for your response when you called our office that you are going to disqualify
California Averland Construction for the reason of non - performance of more than 50% as per
specs and the City of Santa Monica Charter. You also mentioned that you will recommend
Mallcraft as the lowest responsive bidder and that you are disqualifying Orian Construction and
Roofing Inc. as Orian Construction and Roofing Inc. also is not performing 50% work.
We respectfully disagree with your findings for the following reasons:
1. Mallcraft failed to submit their electronic bid
2. Mallcraft failed to list a major subcontractor (Structural Steel and Grating) which is way over
$ 600,000. While Mallcraft in his bid breakdown inserted the price for the structural steel for
$693,220.00 he still failed to enlist a major subcontractor for that portion of work in the
Designation of Subcontractors and Supplier list (Form BF -5) of the bid document . The
conclusion of Mallcraft bid just the structural steel is more than 50% of the total bid (for
Subcontractor work)
3. Mallcraft's Roofing subcontractor price of $327,600 (Listed Subcontractor)
4. Mallcraft listed Rough Carpentry Subcontractor amounting to $ 148,904.00
As an answer to your statement that Mallcraft will perform more than 50% of the work is totally off
track. Mallcraft bid tabulation shows:
1. Structural Steel - $ 693,220 (non - listed subcontractor)
2. Rough Carpentry (Golden State subcontractor) - $ 148,904
3. Roofing (Eberhard subcontractor) - $ 327,600
Total amount for Subcontractor bid is: $ 1,169,724
Grand total of Mallcraft bid is $ 1,375,034 less subcontractor bid of $ 1,169,724 so the total
Mallcraft work will bring you only $205,310 which is below 15% when it requires the Prime
Contractor to self- perform work more than 50 %. Please note that Mallcraft also failed to list the
major steel subcontractor for the amount of $ 693,220.
As for Orian Construction and Roofing Inc. we totally disagree with your statement that we are not
self - performing more than 50 %. We already proved that Orian Construction and Roofing Inc. is
the lowest responsive bidder by submitting the electronic bid and all other bid requirements and
that Orian Construction and Roofing Inc. is also self - performing work more than 50% as showed in
the total bid of $ 1,446,544 as we are self - performing the Roof work amounting to $ 550,000 under
our own license. The only subcontractor involved on this job is the Structural Steel which is listed
for the amount of $ 516,414. If you subtract the Structural Steel subcontractor work of $ 516,414
from the grand total bid of $ 1,446,544, it will give you a total of $ 930,130. The total dollar value
of Orian Construction for self - performance work is way above 64 %.
We strongly feel that Orian Construction submitted the perfect bid and calculation for the Arcadia
Roof Repair project. As such, we hope this information and calculation will help you to have a clear
picture of the whole bid. Rest assured, Orian Construction and Roofing Inc. will provide high
quality and professional service for this project. Attached is a copy of Orian Construction and
Mallcraft Bid form BF -5.
Thank you.
Josef Sayas
President
Bidder's Name'. Orian Construction and Roofing Inc. (enter on each bid form page)
CSI
Div
No
Trade
Subcontractor /Supplier
Name, Phone, &
License No
Address
Portion of
Work (dollar
amount)
0500
Structural
Steel
C A Buchen Corp.(Subcon)
(818)767 -5408
License #209850
_
9231 Glenoaks Blvd.
Sun Valley, CA
$ 516,414.00
Grating
Supplier
Grating Products Inc.
(503) 597 -4190
18129 SW Upper
Boones Ferry Road
Portland, OR 97224
80,000.00
Roofing /Bldg,
Supplier
JB Roofing & Building
Supplies, Inc.
(800) 464 -2461
P.O. Box 5289
Chatsworth, CA
91317
250,000.00
Bolts /Epoxy
Supplier pp
_
Hilti�
(800) 879 -8000
5400 South 122nd
East Avenue, Tulsa
O
5,000.00
-raming/
nchor Supplier
Arrow Tools, Fasteners
& Saw Inc.
(818) 780 -1464
7635 Burnet Ave.
Van Nuys, CA
91405
2,000.00
Public Works I Bid Form Construction I Rev 01111 BF -5
y'
`o
i
Bidder's Name: Mallcraft, ire. (enter on each bid form page)
CSI
Div
No
Trade
Subcontractor /Supplier
Name, Phone, &.
License No `
address
Portion of
Work (dollar
amounf)
7
Roofing
Eberhard
818- 782 -4604
329087
15220 Raymer St.
Van Nuys, CA 91405
$297,818
6
Rou Ca ent
Rough IV rY
olden State Framers
14.524 -9500
20899
610 S. Jefferson St. BI,
Placentia, CA 92870
$96,408
Public Works I Bid Form Construction I Rev 01111
BF -5
Reference Contract No.
9691 (CCS).