SR-10-23-2007-1DCity Council Meeting: October 23, 2007
Agenda Item: l .~ Q
To: Mayor and City Council
From: Eileen Fogarty, Director, Planning & Community Development
Subject: Mills Act Historical Property Agreements between the City of Santa
Monica and the Property Owners of the Designated City Landmark at 822
Euclid Street and the Contributing Structure to the Third Street
Neighborhood Historic District at 2544 Third Street
Recommended Action
Staff recommends that the City Council adopt resolutions authorizing the City Manager
to negotiate and execute Mills Act Historic Property Preservation Agreements (Mills Act
Contract) between the City of Santa Monica and the property owners of one designated
City Landmark at 822 Euclid Street and one Contributing Structure to the Third Street
Neighborhood Historic District at 2544 Third Street.
Executive Summary
The Mills Act is a state law that enables local governments to enter into contracts with
owners of qualified historic properties to authorize a property tax reduction. The Mills
Act is one of the few financial incentives available to owners of historic properties and is
an important tool for implementing the City's goals, as articulated in the City's Historic
Preservation Element, to promote the designation and long-term preservation of historic
resources through the provision of incentives and technical assistance.
1
The City requires Mills Act Contract applicants to provide a report prepared by a
qualified architect describing the condition of the structure and its restoration and
maintenance needs in order to ensure the resource's historic integrity and structural
stability. The recommendations in the architect's report are reflected in the proposed
10-year restoration/maintenance plan which becomes an attachment to the Mills Act
Contract entered into between the City of Santa Monica and property owners. Staff
conducts a site visit to verify the information contained in the report and may identify
additional restoration and maintenance items as necessary.
Execution of the two pending Mills Act Contracts will result in reduced property tax
revenue to the City estimated at $4,046 for the 2008-2009 fiscal year and a similar
amount annually thereafter.
Discussion
Background
In 1991, as part of a comprehensive revision to the City's Landmarks Ordinance, the
City Council authorized designated structures of merit, landmarks, and contributing
structures located in designated historic districts to be considered qualified historic
properties eligible for historic property contracts submitted pursuant to the provisions of
California Government Code Sections 50280-50290. As a result, property owners of
such designated historic properties may file a Mills Act Contract application.
2
Once approved, a Mills Act contract requires the County Tax Assessor's office to
determine the value of the historic property based upon its current net operating
income, rather than upon the traditional assessed valuation method resulting, in most
cases, in a property tax reduction. For residential or commercial structures that are
rented, the net operating income is determined based on actual rents received. For
residential and commercial structures that are owner-occupied, the net operating
income is determined by the income the property would produce if rented. In exchange
for a property tax reduction, the owner agrees to protect, maintain and, if necessary,
restore the historic property.
Under the traditional method of determining property taxes, properties are reassessed
when sold. However, since Mills Act contracts run with the property, subsequent
owners may realize greater tax benefits, as the assessed property value typically
increases when property is sold, resulting in an even greater difference between the
property taxes under the assessed valuation method versus the property tax calculation
permitted by the Mills Act contract. This can be a significant marketing feature for the
property in terms of future sales and are considered an important historic preservation
incentive because the property will be maintained. Similarly, the obligations and
property tax reduction benefits associated with the Mills Act contract are also binding
upon successive property owners during the contract term.
The initial Mills Act contract term is a ten-year period. The agreement is renewed
automatically each year on the contract's anniversary, and an additional year is added
3
to the contract term. This effectively makes the actual term of the contract at least ten
years but possibly indefinite unless the owner or City submits a notice of non-renewal.
If such a notice on non-renewal were submitted, the contract would terminate at the end
of the then current ten-year term.
Alternatively, the owner may petition the City to initiate an immediate cancellation, which
would result in payment of a penalty equal to 12.5% of the property's assessed current
fair market value of the property, as determined by the County Assessor as though the
property were free of the contractual restriction. The City may also cancel the contract
in the event of a breach of contract conditions, whereby the property owner would be
subject to pay the same 12.5% penalty.
Santa Monica Mills Act Contracts
In addition to the certified architect's report, financial data is also required as part of the
Mills Act Contract application in order to calculate an estimate of the potential tax
reduction and provide guidance to the Landmarks Commission and Council in making a
decision on Contract requests. The County Assessor will make a final determination of
the taxes due when the approved Contract is submitted and recorded, and will continue
to conduct property tax assessments on annual basis.
Los Angeles County Assessor's Office data showed that for the 2006-2007 tax year,
property value assessments of thirty-seven of the thirty-nine Santa Monica historic
properties with executed Mills Acts Contracts have been reduced by 12% to 90%, with
4
the average reduction being 51%, when compared to their "Proposition 13" values.
From these Mills Act Contract property value assessments, correspondingly lower taxes
have been levied on these properties. Each year, the County Assessor will reassess
taxes due for properties with Mills Act Contracts.
Data for the 2007-2008 tax year has not yet been received from the County Assessor's
Office; however, it is anticipated that the average reduction in property taxes will be
similar to last year's data, as follows: 2003-2004: 14%-75% reduction with an average
reduction of 47%; 2004-2005: 6%-74% with an average reduction of 42%; 2005-2006:
12%-90% with an average reduction of 51 %; and 2006-2007: 12%-90% with an average
reduction of 51%.
Property owners are required to obtain all applicable entitlements such as a Certificate
of Appropriateness, and all associated building permits for work proposed in the ten-
year restoration/maintenance plan: Furthermore, all work proposed in the ten-year
restoration/maintenance plan must comply with "The Secretary of the Interior's
Standards for the Treatment of Historic Properties with Guidelines for Preserving,
Rehabilitating, Restoring & Reconstructing Historic Buildings" (Weeks & Grimmer,
1995).
Property owners are also required to submit a report to the City on a biennial basis to
demonstrate compliance with Contract terms. .Staff may also conduct a site visit every
other year to ensure that restoration and maintenance plans are implemented in
5
accordance with Contract terms.
Analysis
The two applications submitted in 2007 include a Streamline Moderne multi-family
apartment complex located at 822 Euclid Street and a Craftsman style residence and
Contributing Structure to the Third Street Neighborhood Historic District located at 2544
Third Street. In addition to the specific restoration and repair obligations listed below for
each property, each Mills Act Contract will include a standard requirement for ordinary
maintenance and upkeep throughout the Contract's term for work such as additional
roof maintenance, and plumbing and electrical systems maintenance.
822 Euclid Street
A Mills Act Contract application was filed orr August 14, 2007 for the Streamline
Moderne style apartment building located at 822 Euclid Street. The property was
constructed in 1938 by locally significant builder Frank Bivens. Key character-defining
features of the primary building include its massing, roof form, curvilinear eaves, corner
windows, curvilinear handrails, horizontal bands and fascia, and scored concrete
stairwells. The Landmarks Commission designated the apartment building and
associated accessory garage as a City Landmark on August 13, 2007.
__
As part of the Mills Act application, an architect's report was prepared by the property
owner, Gregory Chazanas, AIA. The report assesses the condition of the primary
building and accessory garage and identifies repair, restoration/rehabilitation and
maintenance needs (Attachment A) along with a schedule for completion of necessary
tasks. A site visit was conducted by staff on September 4, 2007.
Although the subject property is generally in good condition; the building has suffered
from some deferred maintenance over the past several years. The new property owners
have proposed a series of significant work items in the first two years of the Contract
term in order to protect the integrity of the building and its architectural features.
Examples of work proposed during the first year of the Contract include the following
• Repair and repaint the building's exterior stucco finish.
o Repair and reinforce the building foundation.
7
Repair, refinish and repaint roof eaves, fascia boards and the horizontal wood
bands on the building exterior.
• Repair, refinish and repaint or replace in-kind as necessary existing wood
windows throughout the building.
• Resurface and repaint the concrete stairs while still maintaining the scored
concrete design details.
• Clean and repaint the distinctive metal columns and handrails on the building
exterior.
• Repair garage doors, and repair drywall and properly cover exposed wood
framing for the detached garage structure at the rear of the parcel.
Attachment A contains the estimate financial analysis for the property at 822 Euclid
Street.
2544 Third Street
A Mills Act application was filed on August 15, 2007 for athree-story Craftsman Style
bungalow constructed in 1912 located at 2544 Third Street. This residence is a
Contributing Structure to the Third Street Neighborhood Historic District which was
established by the City on July 24, 1990.
The subject residence is both a Contributing Structure to the Third Street Neighborhood
Historic District and is also individually noteworthy for its "airplane bungalow" design
which features a smaller upper story and a lower story roof form that is characterized by
8
its broad horizontality and deep eaves. Other key features of the residence include its
multi-gabled, low pitched roof with overhanging eaves with rafters and beams, its wood
cladding, wood-framed fenestration, and wrap-around porch.
Proposed Maintenance and Rehabilitation Plan
As part of the Mills Act application, a report was prepared by Beckmeyer Carver
Architects to assess the condition of the property and its restoration and maintenance
needs (Attachment B). The report also proposes a schedule for completion of
necessary work. A site inspection was conducted by staff on August 24, 2007.
The residence is currently in excellent condition and has been well restored,
rehabilitated and maintained by the current property owners since beginning extensive
work on the home in 2000. Page two of the attached Architect's Report summarizes the
9
work already undertaken in conjunction with an expansion of the square footage of the
residence.
The ten-year maintenance/rehabilitation plan includes a list of exterior work
recommended during the initial ten-year term of the Contract. The vast majority of work
items are scheduled for 2008. These exterior work items include the following:
• Repair or replace as necessary shingles on the south side of the residence.
• Refinish and seal all existing wood shingles on the exterior of the residence.
• Repair existing wood framed windows.
• Repair the retaining wall on west side of property.
General maintenance items proposed include the following:
• Annual inspection and repair of exterior shingles, roof overhangs, wood trim, the
building foundation, roof flashing, and the concrete porch.
• Annual termite inspection and treatment as needed.
• Annual maintenance and repair of masonry finishes.
The applicant initially included the construction of a new detached garage with second
floor living space as a work item in the draft rehabilitation plan. However staff has
advised the applicant that a future construction project on site is not appropriate for
inclusion in the work plan for a Mills Act Contract. Therefore, this item has been
excluded from the final work plan for the property.
10
Attachment B contains the estimate financial analysis for the property at 2544 Third
Street.
Commission Action
The Landmarks Commission reviewed both Mills Act Contract requests at its September
10, 2007 meeting and directed staff to forward recommendations to the Council in
support of both applications.
Budaet/Financial Impact
Execution of these Mills Act Contracts will result in reduced property tax revenue to the
City estimated at $4,046 for the 2008-2009 fiscal year. Similar reductions in property tax
revenue to the City are anticipated each fiscal year for the life of the both Mills Act
Contracts. However, the amount of revenue loss is not significant in terms of total
property tax revenues collected from all properties in the City. A summary financial
analysis table is included as Attachment C.
Prepared by:
Roxanne Tanemori, Associate Planner
Approved:
Director;'Plarining an~'Cbmmunity
Development l,_/
Forwarded to Council:
. Lamont Ewell
City Manager
11
Attachments:
A. 822 Euclid Street: Draft Mills Act Resolution, Architect's Report, Site
Photographs, and Financial Analysis
B. 2544 Third Street: Draft Mills Act Resolution, Architect's Report, Site
Photographs, and Financial Analysis
C. Summary Financial Analysis Table
12
ATTACHMENT A
822 Euclid Street:
Draft Mills Act Resolution, Architect's Report, Site Photographs, and
Financial Analysis
Partial attachments are not available in electronic format. Entire document is available
for review at the City Clerk's office and the Libraries.
13
GREGORY CgAZANAS, ARCffiTECT
213 S. Linden ]?r.
Beverly Hills, Ca 90212
Telephone:310-277-5350 Fax:310-277-7908
E-Mail: Qchazanasla earthlink.net
August 28, 2007
REPORT OF EXISTING APARTMENT BUILDING
822 Euclid St.
Santa Monica, CA 90403
Scope of Report
The intent of this report is to describe the condition of the existing apartment house and a
plan for the improvements and maintenance.
Prooerty Information and Architectural pescription
The primary structure at 822 Euclid Street is a.two-story, wood-frame, Streamline Modeme
apartment building with stucco exterior walls and four decorative raised.wood bands a
run horizontally along the exterior walls at the windowsill and lintel levels on both the first
and second floor
The eight unit multi-family residence has a flat roof with wide eaves that extend a few feet
beyond the primary elevation. At the comers, of the building, the roof eaves curve, as
opposed to having sharp perpendicular edges: On all fourelevations, the soffit of the roof
is sheathed with #hree wide strips of flat board that are spaced, roughly, two inches apart
creating a gap to amplify the curvilinear form of the eaves and soffit.
All four exterior elevations are organized with a pair of horizontal decorative wood bands
between the windowsill and lintel at both the ground floor-and the second story. Tonal
variation in paint color applied on the exterior elevations highlights the contrasting
appearance of the two wide surface bands that run horizontally along the length of the
elevation. On the east street-facing elevation and the rear, west facing elevation, comers
of the ground and second floor have comer wrap-around windows with four fixed panes
divided by wood muntins. The building features wood framed four light fixed windows, four
light casement windows, and -other wood frame double-hung, slider and fixed windows
found throughout the building.
The south elevation provides circulation to the individual units ftom the heavily landscaped
south side yard. Originally the yard opened onto EuGid Street, but in February 1999, a high
stucco wall with a doorwas added, dividing the yard from the sidewalk. The south elevation
is composed of three bays and staircases to access second floor units. There is also an
awning supported by iwo tension cables attached to the stucco facade at an angle to
shade a unit entry. Each of the staircases features architectural details such as decorated
treads and riser and curved handrails that complement and reinforce the overall design
concept.
At the rear of the property the garages are arranged in a distinctive, stepped U-shaped
plan. The nine garages are accessible from 12th Court, which is the alley between Euclid
Street and 12th Street. The garage spaces form the outer edge of a large U-shaped
concrete driveway. The garages are stucco with wood garage doors with horizontal wood
shiplap siding; The garages were part of the original improvement of the property.
Architectural Significance
The subject property located at 822 Euclid S#reet is an excellent representative example of
the Streamline Modeme architectural style as applied to multi-family housing. It has many
of the character-defining features of Streamline Modeme architecture in its design. The
exterior elevations are dominated by the horizontality of the. windows, the handrails, and
decorative stucco banding that runs the horizontal length of the elevations between the
window lintels and sill on each floor. Also, while the flat roofs and comer windows derive
from Modem architecture, the curvilinearwalls, roof, and handrails clearly anchorthe home
in the Streamline tradition. The curvilinear roof eaves, the slender pipe columns and the
handrails along the exterior stairs that terminate into the ground in a steep curve rather
than attaching to a vertical baluster, are all important character-defining details.
As detailed more fully in Attachment D, following the height of Art Deco in the early 1930s,
the Streamline Moderne style was an economic and stylistic response to the ravaging
effects of the Great Depression. Throughout the 1930s, Streamline Moderne architecture
became a relatively common design style for both single- and multi-family housing,
commercial, and industrial buildings. Streamline structures continued to suggest modern
values of movement and rejection of historic precedents, but. with far less opulence and
more restraint than Art Deco of the late 1920s and early 1934s.
The Streamline Modeme differed from the "High Art Modem Architecture" of the early
1930s in that it "continued to regard design as `styling' and that architecture should
represent or perform as an image rather than be a used as a space to radically change
ones everyday life. The boosters of Streamline Moderne argued thattheir purpose was not
to create architecture that functioned in the same way as the ocean liner, airplane, or
locomotive; rather, the buildings would symbolize those things and therefore remind one of
the `modem' future.nl
While many people were fascinated with modem buildings that represented progress, such
as the movie theatres, service stations, and other commercial buildings, these same
people seemed less inclined to give up traditional notions of domestic architecture when it
came to their residence. In Los Angeles, both single- and multi-family residential
architecture embodied the ideology of Cal'rfornia living. Even though 1930s Los Angeles
had more Modem residential architecture than anywhere else in the country, modern
1. Patrick Pascal, Kesling Modem Shuctures Popularizing Modem Design in Southern California 1934-
housing was still a small fraction of the total housing built. The majority continued to be
constructed using traditional eclectic revival design precedents. Yet, because of the
popular appeal of Streamline design, which was centered on fts ability to be both an image
of modernity. and decorative, Streamline Moderne housing offered a third choice after
traditional and Modem housing. In fact, it was the details of Streamline Moderne
architecture with its curvilinear forms, cornerwindows, and pipe handrails that established
the style's popularrty.2
EXISTING CONDITIONS AND RECOMMENDATIONS
822 Euclid St. was renovated in the past 10 years and the condition of the building is
fairly good, however, there has been no maintenance for the past 3 years, and the
proximity to the ocean requires permanent maintenance in an ongoing basis.
1. EXTERIOR
The exterior is stucco, and there aze cracks and deterioration on the exterior finish and
paint. Stucco needs to be fixed and painted. Cost $15,000.00
2. FOUNDATION WALLS
The foundation shows some deterioration, cracks and water damage. It needs to be
repaired and maintained on an yeazly basis. Cost $4,000.00
3. STRUCTURAL FOOTINGS AND FOUNDATION
The building needs bolting to the existing footings, sheaz panels'/4" plywood on the
.periphery and interior footings. Cost $5,000.00
4. WOOD WINDOWS
This is an area that needs the most work. The original windows from 1938 or 1939 are in
fairly bad shape. They are drying and peeling and the windows do not close properly.
The casement closing system needs to be cleaned and repaired. The window frames need
to be stripped, sanded, repaired, primed and painted again so that they can close properly..
Possibly some of the window frames might need to be replaced with new ones.
Cost $8,000.00
5. HARDWARE
Due to the proximity to the ocean, most of the metal parts of the doors closing system,
doors, and latches, etc...aze rusting. They need to be repaired, and/or cleaned, or
replaced. Cost $4,500.00
6. ROOF
The building has a build up roof installed approximately in 1990, so it is probably azound
16 years old. There are areas that show need of repairs, especially at the joints where
water settles after it rains. All intersections and edges that aze flashed must be inspected
on a yeazly basis and repaired as soon as possible. Cost $5,000.00
7. ROOF OVERHANGS
The curvilinear roof overhangs are fairly deteriorated. The previous owner repaired the 3
bands, but presently they are rooting and detaching from the roof rafters. These need to
be removed, primed, painted and replaced. Cost $4,000
8. STAIRS, PORCHES, HANDRAILS, AND METAL COLUMNS
The stairs have anon-slippery coat that was applied several years ago over the original
surface. They are not quite deteriorated and they need to be recoated, as per insurance
companies which require non-slippery coats on stairs.
The porches are resurfaced with a slate the that needs to be cleaned and re-grouted.
The distinctive metal columns and handrails aze rusting and need to be cleaned, sanded
and painted with a water resistant coat of paint in order to maintain the historical
character of this distinct building. Cost $6,000.00
9. DECKS
There are five decks in the first and second floor in the original concrete finish. They
show cracks and sepazatiori from the main building. Some of these areas show that they
have been repaired in prior years.
Because this conditions allows water to penetrate inside the building, and possibly into
the footings, it is very important to repair and reseal the decks yeazly and repair them as
needed. Cost $3,500
10. DRAINAGE
There aze drains in poor condition and they need to be cleaned and repaired to avoid
water buildup. Cost $1,500
11. TERMITE DAMAGE AND DRY ROT
Termite damage was existing when we purchased the building. A termite report was
issued showing infestation in the basement under the building. Some of the work was
done after close of escrow. A yearly maintenance program is necessary. It is also
necessary to replace some wood that has been attacked by termites. Cost $2,500
12. STRUCTURE
The 1994 Northridge earthquake caused modest damage to the exterior stucco and
structural systems, footings, piers and walls. According to the September 30, 1995
Historic Resource Inventory Update Report from the City of Santa Monica, all repairs
were completed except the wood trim.
After purchasing the property , we inspected underneath the structure and we noticed that
we need to bolt, reinforce and brace the footings with plywood. Cost $6,800.00
13. EXTERIOR WOOD BANDS
The exterior elevations are dominated by prominent horizontal elements, the windows,
handrails and wood bands that wrap around the corners. These wood bands aze
deteriorating and detaching from the building.
The horizontal wood bands need to be stripped, sanded, reattached to the building,
waterproofed, primed and sanded or replaced as needed. Cost $4,500.00
14. LANDSCAPING
At the close of escrow, we were informed that for the last 3 months, there had not been a
gazdening service maintaining the landscape of the building. When we took possession
of the building, the landscape was quickly deteriorating. Sprinklers were not working,
and the outside electrical lights were not working at all.
To improve the landscape, new dirt, fertilizer need to be brought to enrich the soil, and.
new plants aze need to fill in the azeas where previous plants burned or died because of
lack of water. Also, the sprinklers need to be fixed, as well as all the garden lights.
On the north side of the building, there is a walk way that has no landscaping, 15 new
trees and ground coverage is required. Cost $6,500.00
15. GARAGES
There are 9 existing gazages for 8 apartments and several storage areas attached to the
garages. The laundry roon has been finished with drywall, however, the garages and
storage areas have 2" * 4" exposed framing, no drywall, and some of the ceiling drywall
is falling down.
The 9 gazage doors are in need of repairs, some need their doors to be fixed and/or
replaced.
The storage spaces need to be insulated and dry walled, and new hardwaze needs to be
installed. Cost $12,500
16. ELECTRICAL AND PLUMBING
The electrical and plumbing systems appear to be working properly: There are new
electrical panels with new wiring in each apartment. The plumbing is copper, but it is old
and needs repair periodically.
The water heater needs maintenance and copper pipes need regulaz maintenance.
Cost $2,000.00
17. WINDOW SCREENS AND TURBINE FANS
None of the apartments have window screens.- New window screens will be
manufactured for all the units. Also non-electrical turbine fans will be installed in the
roof in order to remove the hot air from the attic. Cost $3,500.00
Landmarks Commission Meeting
September 10, 2007
Item #11-A -Consideration of Mills Act
Contract Applications for Designated
Landmarks and Contributing Structures
to the Third Street Neighborhood
Historic District
822 Euclid Street
Attachment B -Proposed 10-Year
Maintenance Plan and 10-Year
Rehabilitation Plan
GREGORY CHAZANAS, ARCHITECT
213 S. Linden Dr.
Beverly Hills, CA 90212
Telephone:310-277-5350 Fax:310-277-7908
E-Mail: ~chazanas(a~earthlink.net
August 28, 2007
10-YEAR MAINTENANCE PLAN
822 Euclid Ave.
Santa Monica, CA 90403
Scope: This report is to itemize a checklist of recommended regulaz maintenance tasks
necessary to preserve the historical aspects and integrity of the building on a long term
basis.
ITEM YEAR TASK ESTIMATE
1 Annually Inspect exterior stucco and repair, as needed $2,500.00/yr
2 Annually Inspect for cracks and damage to foundation.
Repair 1,000.00/yr
3 Annually Inspect and repair footings and foundation 750.00/yr
4 Annually Inspect and repair wood windows & doors 3,000.00/yr
5 Annually Inspect door and window hardware 2,500.00/yr
6 Annually Inspect and repair roof 1,000.00/yr
7 Annually Inspect and repair roof overhangs 1,500.00/yr
8 Annually Inspect and repair stairs, porches, handrails and
metal colums 3,000.00/yr
9 Annually Inspect and repair decks, and reseal. 3,500.00/yr
10 Annually Clean and repair drainage 1,500.00/yr
11 Annually Inspect and repair for termites and dry rot 2,000.00/yr
12 . Annually .Inspect and repair structural frame 2,500.00/yr
13 Annually Inspect and repair exterior wood bands 1,500.00/yr
14 Annually Maintain landscaping, imgation system and
landscaping lighting, gardening 3,000.00/yr
15 Annually Inspect and repair 9 gazages, and storages 1,500.00/yr
16 Annually Maintain and repair electrical and plumbing 5,500.00/yr
17 Annually Maintain and repair window screens and
turbine fans, smoke detectors, etc... 2,500.00/yr
18 Annually Rent control fees, business license 1,500.00/yr
19 Annually Inspect and maintain fire extinguishers 500.00/yr
TOTAL $40,930.00lyr
P o.
np
C-091fi71 K~~-'>
At n AL\FU~
GREGORY CHAZANAS,ARCHITECT
213 S. Linden Dr.
Beverly Hills, CA 90212
Telephone: 310-277-5350 Fax: 310-277-7908
E-mail: gchazanasnearthlink.net
August 28, 2007
10-YEAR REHABILITATION PLAN
822 Euclid St.
Santa Monica, CA 90403
Scope: This report is to itemize a checklist of one-time rehabilitation or restoration tasks
necessary during the next 10 years to preserve or correct the historical aspects and
integrity of the building on a long-term basis.
ITEM YEAR
1 2007
2 2008
3 2008
4 2008
5 2008
6 2008
7 2008
8 2008
9 2008
10 2008
11 2008
12 2008
13 2008
14 2008
15 2009
16 2009
17 2008
TOTAL
TASK ESTIMATE
Repair exterior stucco $15,000.00
Repair exterior foundation wa115 5,000.00
Repair structural footing and foundation 5,000.00
Repair wood windows, sashes, casement operators 8,000.00
Repair hardwaze hinges and latches 4,500.00
Repair roof 5,000.00
Repair roof overhangs, as needed 5,000.00
Repair stairs, porches, handrails and metal columns 6,000.00
Repair and reseal decks 3,500.00
Repair and replace drains, as needed 1,500.00
Repair dry rot and maintain building free of termites 3,750.00
Repair all structural .cracks 6,800.00
Repair and maintain exterior wood bands 4,500.00
Replant, repair sprinkler system, fix lighting in garden 6,500.00
Repair garages and storage azeas, drywall 12,500.00
Repair copper plumbing, new water heater 4,500.00
Install new window screens and turbine fans 3,500.00
$100,550.00
~ ~'-
~.Ut,
~~'_
'~ ~~,
r
~~
~ ~
,.
~ ~~
~ ~. ~~,
r
ATTACHMENT B
2544 Third Street:
Draft Mills Act Resolution, Architect's Report, Site Photographs, and
Financial Analysis
Partial attachments are not available in electronic format. Entire document is available
for review at the City Clerk's office and the Libraries.
14
BECKMEYER CARVER ARCHITECTS
5659 Berkshire Drive, Los Angeles, CA 90032
Telephone 310.251-2184 Fax 310-398-9919
E-Mail kurtbeckmeyer@hotmail.com
August 6, 2007
REPORT OF EXISITNG HISTORIC HOUSE
2544 3rd Street &238 Ocean Pazk Blvd. (combined)
Santa Monica, CA 90405
Scope of Report
The intent of this report is to generally describe the condition of the existing house and a plan for
its renovation and maintenance.
General Description
The existing structure is a 1912 three-story Craftsman residence located on the northwest comer
of Third Street and Ocean Park Boulevard. This building type is known as an "airplane
bungalow" due to the fact that its upper story is smaller than the lower story, with exaggerated
roof overhangs that create "wings" spreading out horizontally suggesting a cockpit on an
airplane. At the time the building was inventoried in 1993, it received a NRHP status code of
3S, which means that the property was National Register eligible (see attached Inventory Sheet).
Characteristic features of the design include amulti-gabled; low-pitched roof with extended
rafters and beams in the overhanging eaves; an L-shaped porch wrapping the facade and
northeast corner; stone on both chimneys; andbands of windows in rows of rectangular panes
along the upper story.
The original builder of the residence is unknown. The original owner of the house is unknown
and it is a contributing structure to the Third Street Neighborhood Historic District, and
potentially eligible for listing on the National Register of Historic Places.
The subject property consists of an irregulazly shaped lot [49.88' x 129.71' (left side and 119.71'
(right side)]. This 8,090 square foot parcel is located in the OP2 (Ocean Pazk Low Multiple
Family Residential) District. With the exception of some small strips of designated pazkland, all
parcels surrounding the subject parcel are developed with multi-family residences and aze zoned
OP2.
-1-
Recent Actions
In 2000, the applicant applied for and obtained VAR 00-019 to allow expansion of the existing
home. The existing basement (422 s.f.) and crawl space (710 s.f) were converted to habitable
space (therefore counting as a story), and were expanded by 286 s.f., for a total of 1418 s.f. on
the lowest level. Other additions included: a total of 66 s.f. added to the second floor level (for a
total of 1226 s.£); and 184 s.f added to the 290 s.f. third floor level (for a total of 474 s.f.). New
deck areas totaling 402 s.f. were added to the existing 260 s.f. deck azeas, for a total of 662 s.f. of
deck area.
A Certificate of Appropriateness No. LC-CA-00-005, was approved for this work under the
Third Street Neighborhood Historic DistricYDesign Guidelines and the Secretary of Interior's
Standards for Rehabilitation to rehabilitate the home which is a contributing structure to the
Third Street Neighborhood Historic District. The following items were repaired, restored, and
/or replaced: the foundation, wood shingles, chimney, windows, and basement. The following
additions were also approved and constructed: A block fence with river rock pilasters, a 350
square foot deck at the reaz of the house, two small additions totaling 66 squaze feet on the north
side of the house, a 52 square foot deck and 184 square foot addition on the second floor, and a
wood-framed exterior staircase along the side elevation.
More specifically, rehabilitation of the following were undertaken:
1. Removal, cleaning, and re-installation of the river rocks on the two chimneys and porch
columns.
2. Rehabilitation and/or replacement of the redwood shingles. If a means to clean and
repair the existing redwood shingles is not available, deteriorated shingles will be
replaced with new shingles cut to match the existing.
3. Reglacement of the existing foundation. As part of the foundation repair, the house will
be raised and moved two feet northwazd to allow for a driveway along the sideyard. This
new foundation will not affect the exterior elevations.
4. Repair and/or replacement of the existing windows. Windows will be repaired and
restored where possible. In the case of windows which have been replaced with
aluminum framing, new wood windows will be replaced to match the original window
configurations (e.g., paned, casement and double-hung).
And, new additions were approved and constructed:
1. First Floor: a 40 squaze foot cantilevered addition to the kitchen along the north side; a
26 square foot cantilevered addition to the utility room along the north side; a 350 square
foot open, wood-framed deck at the reaz of the structure; and awood-framed staircase
along the northern sideyard which leads from the basement to the first floor level.
2. Second Floor: A 184 square foot addition to the second floor (master bedroom suite),
and a 52 squaze foot deck off the bedroom at the rear of the house.
3. Site Improvements: Anew Craftsman-style fence with stone pilasters and stucco walls
along the Ocean Park Boulevard sideyard. A wooden fence along the reaz and southern.
sideyazds were also constructed.
-2-
EXISTING CONDITIONS AND RECOMMENDATIONS
Inasmuch as the home was extensively renovated and restored in 2001, its general exterior
condition is good, however its natural finishes and their proximity to the ocean will requires
further restoration at this time and intense maintenance on an ongoing basis.
SHINGLES
Existine
As mentioned above, the home's origina136" redwood bam shingles were deteriorated and
replaced in 2001. Except where interrupted by stone or trim or foundation walls, all exterior
vertical surfaces are protected by these shingles, which aze essentially untreated.
Recommendations
• Each year, the exterior shingles on the building should be inspected, and appropriate measures
taken for their preservation.
• Many, if not most, of the shingles on the south side are in need of major repair or replacement.
• Depending upon their exposure to deteriorating effects of sun and salt air, many other shingles
need loving caze.
• All shingles are in desperate need of preservative treatments carefully researched for this
particulaz applications.
WOOD TRIM
Existine
The 1x6 and 1x4 exterior wood casing window and door trim were also replaced during the 2001
restoration. This trim occurs at all exterior openings.
Recommendations
• Similar to the needs of the shingles, this wood material is vulnerable to the effects of sun and
salt air; and after a thorough inspection, many components need refinishing at this time, and all
will need repainting regularly.
FOUNDATION WALLS
Existine
The foundation walls consist of a skim coat of stippled gunite simulating a stone treatment.
Recommendations
• Annual inspection is necessary for signs of cracking or spallation.
• Restorative repair should be undertaken immediately upon discovery of such conditions
inasmuch as deterioration should not be allowed to continue.
-3-
ROOF OVERHANGS
Existine
The roof overhangs on both the eaves and rakes aze exaggerated as is typical with the Craftsman
"Airplane Bungalow" style. The undersides of these elements show their exposed and extended
rafter tails and structural outrigger beams which are covered on their tops with lx resawn T&G
wood boazds. These components are all painted. The roof edges are temunated with a
galvanized edge metal.
Recommendations
• While the underside of the overhangs are well protected and therefore likely to weather
substantially better than the surfaces exposed to the elements, annual inspection and paint touch
up needs to be administered in order to prevent serious deterioration.
• Even though the undersides of the overhangs aze well protected, the extended beams and rafter
tails are extremely vulnerable components due to the daily exposure to dew and sun, which
promotes dry rot. Qnce this process begins, it is very difficult to arrest and most frequently
results in slipshod patchwork repair. The zecommended method of preserving these very
important design elements is the addition of copper caps atop each of the members so exposed.
Each of these caps needs to be broken and soldered along the edges to create vertical legs of at
least 3/a".
ROOFING
Existine
The surface of the roof is finished with dimensional composition shingles suggesting wood
shingles.
Recommendations
• The roof general has a number of years of life left in it, but there aze azeas that aze subject to
heavy concentrated runoff and need to be watched closely in order to avoid major damage
caused by roof leaks.
• All intersections and edges that are flashed must be inspected regularly to detect rusting or
rotting in a timely manner. Any such deterioration must be repaired.
PORCHES
Existin
The porches have exposed concrete surfaces to match the appearance of the original concrete.
Recommendations
• The concrete surfaces are in good condition, but signs of cracking need to be monitored,
especially where those surfaces occur over interior spaces. All cracks discovered need to be
repaired by an expert who is sensitive to the need to maintain the chazacter and appearance of the
home.
-¢-
DECKS
Existine
Simulated concrete decks occur on the middle and upper levels of the west side of the house, and
occur over interior spaces. Some have already shown evidence of separation and cracking, and
those azeas have been repaired.
Recommendations
• Because these conditions occur over interior spaces, it is of utmost importance that the seal be
maintained intact continually. It is important that even minor intrusion by moisture be prevented
totally. It is best, therefore, to enter into a regulaz program of sealing these surfaces every yeaz
or two.
• The drainage from these decks is also critical, and any blockage would create major water
damage interior of the house. It is necessary, therefore, that the drainage systems of these decks
be inspected prior to the rainy season every year in sufficient time to make any repairs necessary
ahead of the rains.
RAILS
ExiSting
They aze bounded by a rail system composed of heavy wood timbers and deck trim, with the
timbers turned on their sides. These members were also replaced in 2001 to match the original.
The wood rails are painted.
Recommendations
• Similar to other areas of wood trim, these components need to be properly prepazed and
painted immediately upon finding any cracks or peels, especially at the joints.
WINDOWS AND DOORS.
Existine
These components of the building aze a blend of the original units and new units circa 2001.
Both are wood frame to maintain the consistency of the style. Some of the units are in need of
operational repair and some in need of structural repair. Neither is severe. In some cases,
screens are missing or loose.
Recommendations
• Sash balances, casement hinges, casement operators, and casement latches need to be replaced
as necessary.
• Where the units themselves are beyond reasonable repair and maintenance, they may need to
be replaced by authentic and accurate custom units that match the existing in all details.
• In addition to the protection from bugs and vermin that the window screens provide, they also
serve as an excellent additional layer of protection from the climatic elements. Where possible,
wood frame screens are the preferred type, however, the existing aluminum frame screens are
-5-
satisfactory. Consider using a dazk anodized frame however, to bring less attention to the screen
itself. Better yet, consider using Hollywood retractable screens.
• Several oak thresholds are heavily weathered and aze in need of restorafion or replacement.
Heavy application of marine varnish aze needed to adequately protect them.
EXTERIOR EMBELLISHMENTS
Existine
Additional exterior embellishments include the restored river rock chimneys, which were
completely dismantled, cleaned and reinstalled in 2001 to match the photographic documentation
reseazched prior to demolition. Chimney caps appeaz to be missing. Period door and window
hazdwaze provide the final touches of style.
Recommendations
• A qualifl ed mason should inspect all the masonry elements annually and repair or repoint any
problematic areas.
• While there were no signs of efflorescence at the time of this report, such mortar problems
should be idenfified and replaced along with the annual inspection by a mason.
• Properly designed and aesthetically appropriate chimney caps should be installed.
• The weather in this climate corrodes hardwaze, which will need to be replaced or repaired from
time to time. As replacement occurs, higher quality components will holdup better than items of
lesser weight and. quality. Polished finishes should be avoided. Copper, bronze, or dull brass
will weather better.
TERMITES
Existin
Not atypical to structures in Southern California, this house is especially vulnerable to the attack
of termites, and evidence of ternute activity is present at this fime.
Recommendations
• Immediately acquire a ternute report from a certified extermination company and perform the
recommended service.
• An annual maintenance program is needed whereby inspections an follow up treatment take
place every year to control the unavoidable nature of this pest.
SITE FEATURES
Existine
The property line boundaries are identified by a concrete block wall; which is articulated by river
rock pilasters with concrete caps and planter areas between. These walls are taller along the
sides and low in the front. Both vehicular gates and pedestrian gates are painted wood. The
fence along the south property line is primarily wood and needing repair. The property line
-6-
fence/wail along the west side is incomplete, apparently awaiting the construction of a Garage.
Site drainage is very positive from the east to the west, however more complex collection basins
and pumps have been installed in the northwest area of the property.
Recommendations
• The block and river rock walls are in good shape and quite durable. Minor maintenance will
insure their longevity.
• The plant material is mature and normal landscaping with regular rotation and replacement
will preserve the property satisfactorily.
• The wood fence along the south side has the hint of an afterthought, and as a long term
solution, a block wall with river rock pilasters similar to the others would be an improvement
both aesthetically and functionally.
• There are unsaflsfactory retaining conditions along the west property line that need repair to
prevent runoff into the adjoining property. For efficiency purposes, this should be undertaken
along with the construction of a future Garage.
• The catch basins and pump systems must be inspected at least annually and maintained fully
operational at all times. Inasmuch as the property has excellent slope and the street is
immediately available for the discharge of runoff, consider the replacement of the pump system
with a passive gravity flow system. This requires the integration of all City requirements and
approvals.
GARAGE
Existine
None.
Recommendations
• The property is incomplete without a Garage, and the incorporation of a combination
Garage/2°d Floor living space would be entirely appropriate.
ELECTRICAL, PLUMBING AND HVAC
Existine
These components of the building were upgraded and improved during the major renovations of
2001, and they are currently in good condition. The HVAC system is ahigh-velocity system
installed to minimize the intrusion of conventionally-sized ductwork thereby maintaining the
architectural integrity of the building. Period light fixtures are important to maintain the faithful
continuation of the style and some aze showing sides of excessive corrosion.
Recommendations
• All existing circuits need to be accurately traced and labels at their breakers.
• Confirm proper strapping and venting of water heater.
• Establish a regular maintenance /repair program for all HVAC systems. The high velocity
system must be maintained by a qualified service company experienced in these systems.
-7-
• As previously mentioned, the weather in this climate corrode the metal light fixtures, which
will need to be replaced or repaired from time to time. As replacement occurs, higher quality
components will hold up better than items of lesser weight and quality. Polished finishes should
be avoided. Copper, bronze, or dull brass will weather better.
-8-
Landmarks Commission Meeting
September 10, 2007
Item #11-A -Consideration of Mills- Act
Contract Applications for Designated
Landmarks and Contributing Structures
to the Third Street Neighborhood
Historic District
2544 Third Street
Attachment B -Proposed 10-Year
Maintenance Plan and 10-Year
Rehabilitation Plan
BECKMEYER CARVER ARCHITECTS
5659 Berkshire Drive, Los Angeles, CA 90032
Telephone 310-251-2184 Fax 310-398-9919
E-Mail kurtbeckmeyerC~hotmail.com
August 6, 2007
10-YEAR MAINTENANCE PLAN
2544 3rd Street &238 Ocean Park Blvd. (combined)
Santa Monica, CA 90405
Scope: This report is to generally itemize a checklist of recommended regular maintenance tasks
necessary to preserve or historical aspects and integrity of the building on a long-term basis.
ITEM YEAR TASK ESTIMATE
1 Annually Inspect exterior shingles and seal! refinish as required. $2,000/yr
2 Annually Inspect, prep, repaint, all wood trim in need of repair. 5,000/yr
3 Annually Inspect for cracks and spallation in foundation. Professionally
repair. 500/yr
4 Annually Inspect underside and extensions of overhangs. Repair
or repaint as required. 5,000/yr
5 Annually Inspect roof membrane and reinforce or repair as required. 500/yr
6 Annually Inspect roof flashing. Repair or replace areas of excessive
corrosion. 500/yr
7 Annually Inspect concrete porch surfaces and properly repair as required. 500/yr
8 Annually Inspect deck membranes. Repair by certified contractor as
required. Alternately reseal annually. 2,000/yr
9 Annually Inspect, unclog, repair all roof deck drains frequently. 200/yr
10 Annually Inspect wood railings and edges. Properly prep and reseal
as required. 1,500/yr
11 Annually Inspect masonry finishes. Repair or repoint as required.
Replace mortar showing signs of effluorescence. 1,000/yr
12 Bi-annually Inspect door and window hardware. Replace or repair. 1,000/yr
13 Annually Incorporate a program of temute inspections. Make
recommended repairs. 1,000/yr
14 Annually Monitor condition of site river rock walls. Repair as required. 500/yr
15 Annually Monitor condition of plant materials and imgation system
and repair as required. 2,000lyr
16 Annually Monitor condition and proper operation of sump system at
northwest comer of property and repair as required. 500/yr
17 Annually Professionally inspect high-velocity HVAC system. Provide
routine and special maintenance as required. 500lyr
TOTAL $24,200/yr
-~-
BECKMEYER CARVER ARCHITECTS
5659 Berkshire Drive, Los Angeles, CA 90032
TelephoneSlO-251-2184 Fax 310-398-9919
E-Mail kurtbeckmeyer@hotmail.com
August 6, 2007
10-YEAR REHABILITATION PLAN
2544 3rd Street &238 Ocean Park Blvd. (combined)
Santa Monica, CA 90405
Scope: This report is to generally itemize a checklist of recommended one-time rehabilitation or
restoration tasks necessary during the next 10 years to preserve or correct the historical aspects
-and integrity of the building on a long-term basis. Those items of a more urgent nature aze
assigned earlier dates.
ITEM YEAR TASK ESTIMATE
1 2008. Repair/replace the shingles on the south side as required. $10,000
2 2008 Refinish /seal /preserve all existing bam shingles with
appropriate material. 10,000
3 2008 Add copper caps to exposed rafter tails and beam extensions. 5,000
4 2008 Repair broken casement operators, sash balances, hinges and latches. 5,000
5 2008 Repair irreparable sashes. 5,000
6 2008 Repair window screens as necessary. Add where missing.
Recommend considering Hollywood screens. 8,000
7 2008 Repair or replace rotted oak thresholds. Varnish well. 2,000
8 2008 Design and install code-complying chimney caps appropriate
to the style. 4,000
9 2008 Replace irreparable replica door and window hazdware with
authentic heavy duty, high quality bronze or dull brass or copper.. 8,000
10 2008 Obtain termite report and make necessary repairs. 2,000
11 2008 Address problems with wood fence on south property line.
Consider using block /. river rock wall to match north. 8,000
12 2008 Repair west retaining wall. Coordinate with Garage (Item #14). 8,000
13 2010 Investigate alternatives to the sump system at the northwest corner
of the property. Passive gravity system is preferred.. 8,000
14 2009 Add detached Garage and 2nd floor living space.in the southwest
corner of the property.where the original once stood. 125,000
15 2008 All existing circuits need to be accurately traced and labeled at
their breakers. 1,000
16 2008 Confirm proper strapping and venting of water heater. 500
17 2010 Replace deteriorated and corroded light fixtures with heavy duty
copper fixtures. Preferably authentic restored period fixtures. 5,000
18 2012 Replace water heater. Consider using tankless unit concealed. 3,000
19 2012 Major HVAC repair. 5,000
TOTAL $222,500
-~-
Landmarks Commission Meeting
September 10, 2007
Item #11-A -Consideration of Mills Act
Contract Applications for Designated
Landmarks and Contributing Structures
to the Third Street Neighborhood
-Historic District
2544 Third Street
Attachment C -Estimate Financial
Analysis Spreadsheet
ESTIMATE FINANCIAL ANALYSIS FOR MILLS ACT CONTRACT**
2544 Third Street, Santa Monica, CA
REVENUES Current
1) Est. Monthly Rentallncome 3% $4,500
2) Annual Rental Income .$54,000
ANNUAL EXPENSES
Gen. Expenses: 25%SFD, Others 30% $13,500
Vacancy loss 3% $1,620
8) Total Expenses $15,120
(Sum Lines 8-9)
NET OPERATING INCOME (NOI) $38,850
(Line 2 Minus 8)
CAPITALIZATION RATE
9) Interest Component 5.5%
10) Historic Property Risk 4%
(2%, or 4% for SFD)
11) Property Tax Component 1%
12) Amortization Component 0.5%
13) Capitalization Rate 11%
(Sum Line 9 - 12)
TAXES
14) Mills Act Assessment $353,455
(NOI/ Line 13)
15} Tax Under Mills Act $3,659
(Line 14 X .01035146)
16) Current Tax $8,027
17) Tax Savings
(Line 16 -Line 15) $4,368
18) Annual Costs to City
(Line 17 X 16%) $699
**This worksheet provides only an estimate analysis.
The County of Los Angeles Office of the Assessor is responsible
for calculating official Mills Act property tax assessments each year.
Landmarks Commission Meeting
September 10, 2007
Item #11-A -Consideration of Mills Act
Contract Applications for Designated
Landmarks and Contributing Structures
to the Third Street Neighborhood
Historic District
2544 Third Street
Attachment D -Property Photos
28.JPG
Narn~ IMG_0123.J PG
Name IMG_0129.J PG
y _.
Name: IMG_07 7 9.JPG
Name: IMG_0112.JPG
Narne: IMG_4241.J PG
Name: IMG_4235.JPG
Nane:
Name: IMG_4304.JPG
ATTACHMENT C
Summary Financial Analysis Table
Electronic version of attachment is not available for review. Document is available for
review at the City Clerk's Office and the Libraries.
15
Attachment C
2007 -- SUMMARY OF ESTIMATE FINANCIAL ANALYSIS FOR MILLS ACT CONTRACTS**
Property Est. Assessed Current Tax Est. Tax Est. Mills Act Est. Reduction in City Revenue City Revenue City Revenue
Address Value (MILLS (Prop. 13) (MILLS ACT) Tax as a % of Property Tax (Prop. 13
(MILLS ACT)
Reduction
ACT) Current Tax
822 Euclid Street $1,178,753 $33,124 $12,202 36.8% -$20,922 $5,300 $1,952 ($3,348)
2544 Third Street $353,455 $8,027 $3,659 45.6% -$4,368 $1,284 $585 ($699)
**This worksheet provides only an estimate analysis. The County of Los Angeles Office
of the Assessor is responsible for calculating official Mills Act property tax assessments each year.