Loading...
SR-303-017 EPWM:CP:AA:LF:LB F:\data\SPfiles\SP1827\cc1827 Council Meeting: May 2, 2000 Santa Monica, California TO: Mayor and City Council FROM: City Staff SUBJECT: Recommendation to Award Construction Contract for Los Amigos Park Playground to ABC Lawn Sprinkler Co., Inc. and to Authorize the City Manager to Negotiate and Execute a Construction Management Contract with DMR Team, Inc. Introduction This report recommends that the City Council award a construction contract to ABC Lawn Sprinkler Co., Inc., the lowest responsible bidder, in the amount of $146,325 to construct and install the playground at Los Amigos Park, and approve $21,949 in contingency funds for the project. This report also recommends that the City Council authorize the City Manager to negotiate and execute a construction management contract with DMR Team, Inc. in an amount not to exceed $15,122, and approve $2,268 in contingency funds for this contract. Background In the fall of 1997, a group of students from Santa Monica Alternative School House (SMASH) founded "Project Play" to establish a playground for older youth (ages 8-13). Although several play areas had been built on the campus, the play equipment had been designed for younger students. The older youth prefer age appropriate equipment to play 1 th on. The school is located at 5 Street and Ocean Park Boulevard, adjacent to John Muir Elementary School and Los Amigos Park. Throughout the 1997-98 school year, the students gathered play structure manufacturers' catalogs, conducted surveys to find out what older students would like in a playground, met with several architects, and presented their project and fundraising ideas to the City Council in January 1998. In recognition of the students' efforts, and in light of the benefits of the shared school and park use of the playground, the proposal was made a part of the City's Capital Improvement Program. Funds in the amount of $118,500 were appropriated in FY1999-00 to complete the necessary design work, have a site survey taken, and construct the playground. During the 1998-99 school year, the Project Play students at SMASH and John Muir raised a total of $36,380 for the playground, including a grant received from the Saban Corporation. This project is partially funded with monies from this source which are held in a trust account. On February 10, 1998, City Council approved the modification of a design contract with Rios Associates for drawings and construction documents for the Douglas Park Renovation and the Childrens Play Areas in Four City Parks Project to add a playground = for older children at Los Amigos Park. The construction documents are now complete, and have been reviewed and approved by the SMMUSD. The Los Amigos Park Playground Project includes construction of a new playground which 2 provides play elements primarily for older children including a large multi-purpose climbing structure, two separate overhead swinging apparatuses and a turning bar apparatus. The hardscape includes concrete and rubber safety surfacing. Over 50% of the play events provide disabled access. Discussion A Notice Inviting Bids for the construction contract was published on March 12 and 16, 2000 in the Los Angeles Times Our Times section and The Green Sheet. Bid A@ documents were sent to 12 women/minority business enterprise associations (WMBE). Bid packages were requested by 10 contractors. The City Clerks office received six = sealed bids which were publically opened and read aloud on April 3, 2000 by the Deputy City Clerk. The results for the base bid were: ABC Lawn Sprinkler $146,325 Han & Kim Construction $156,800 Pima Corporation $158,450 Malibu Pacific Tennis Courts, Inc. $159,450 Thompsen Landscape $170,060 BA Construction $196,000 Engineers Estimate $132,500 = ABC Lawn Sprinkler Co., Inc. was determined to be the lowest responsible bidder. 3 Representatives from three current or recently completed public projects, including the City of Anaheim, the City of Glendale and Los Angeles County, were contacted and all reported that the contractors work was satisfactory. Similar completed projects include = renovation of an existing park with neighborhood center and playground, and renovations of numerous existing parks including landscape, irrigation and hardscape. The California Contractors State License Board verified that the contractors license is current, active, = and in good standing. Construction is scheduled to begin in early June and take approximately 90 days to complete. A Request for Qualifications for construction management services was issued on July 26, 1999, to pre-qualify firms. The City pre-qualified four firms to provide construction management services for park projects. As part of the pre-qualification process references were checked from recent projects, representatives reported that the consultants work was = satisfactory. They were interviewed by a selection panel which included representatives from the Engineering and Utilities Divisions of the Environmental and Public Works Management Department. DMR Team, Inc. was recommended to provide construction management services for this project. DMR Team, Inc. has successfully managed construction for the City of Santa Monica in the past on a wide variety of projects including the Pico Streetscape Project, the 1997-98 Federal Street Resurfacing Project #2, and the Joslyn Park Playground and Selected Site Improvements Project. The DMR Team, Inc. is currently managing the Municipal Pool Replacement Project; their work has been very good. 4 Budget/Financial Impact FUNDS REQUIRED Contractor $146,325 Contingency 21,949 SUB-TOTAL $168,274 Construction Manager $ 15,122 Contingency 2,268 SUB-TOTAL $ 17,390 TOTAL $185,644 Funds are available in the following accounts: C01042198.589000 $ 38,449 C01044500.589000 $110,815 80.201214 (Trust Account) $ 36,380 TOTAL $185,644 Recommendation Staff recommends that the City Council: 1.Award a contract for the construction of the Los Amigos Park Playground to ABC Lawn 5 Sprinkler Co., Inc., the lowest responsible bidder in the amount of $146,325.00 and approve $21,949 in contingency funds for the project; and 2.Authorize the City manager to negotiate and execute a construction management contract for the Los Amigos Park Playground with DMR Team, Inc. in the amount of $15,122 and approve $2,268 in contingency funds for this contract; and 3.Authorize the City Engineer to issue any necessary change orders to complete additional work in conformance with the Administrative Instructions on change orders and within budget authority. Prepared by: Craig Perkins, Director of Environmental & Public Works Mgt. Barbara Stinchfield, Director of Community & Cultural Services Brett Horner, C & CS, Senior Administrative Analyst Anthony Antich, P.E., City Engineer Lorrie Brown, Civil Engineering Associate 6