Loading...
SR-121796-6G Contract 6582 (CCS) 6r~ , PCD SF RF JR bayclrc Santa MOnica, CahforBiC , 7 1998 CouncIl Meeting, December 17, 1996 TO Mayor and CIty CouncIl FROM City Staff SUBJECT Recommendatron to Authorize the City Manager to Negotiate and Execute a ProfeSSional ServIces Contract with WPA Traffic Englneenng, Inc for the Design of the First Phase of the Downtown Circulation Plan Introduction ThiS report recommends that the City Council authorize the City Manager to negotiate and execute a professional services contract with WPA Traffic Englneenng, Inc In an amount not to exceed $105,210 for the design of the first phase of the downtown circulation plan Components of the first phase Include the following - Restnpe 4th Street to eliminate one lane northbound and add metered parking on the east Side between Wilshire Boulevard and Broadway - Restnpe 5th Street to add one lane southbound and two-way left turn median, maintaining two lanes northbound and parking on both Sides between Wilshire Boulevard and Colorado Avenue - Restnpe Broadway to carry two-way traffic between Ocean Avenue and Lincoln Boulevard - Modify Santa MOnica Place parking structures as necessary due to the Introduction of two-way traffrc on Broadway - Eliminate left turn out of Santa Monica Place parking structure to eastbound Colorado Avenue - Establish a controlled nght-turn from northbound Ocean Avenue to eastbound Colorado Avenue 1 6[~ .' , DEe , 7 19S6 - Modify traffic signals and timing to facIlitate new traffiC flow BackRround As part of the adoptron of the Bayslde DIstrict Specific Plan In January 1996, the City Council authOrized the City Manager to negotiate and execute a contract With Roma DeSign Group to prepare the downtown urban deSign plan for the area bordered by Wilshire Boulevard on the north. the Santa MOnica Freeway on the south, the alley between Seventh Street and Lincoln Boulevard on the east, and Ocean Avenue on the west The first phase of the project Involved the development of a plan to modIfy the circulation system In the downtown area to balance the needs of pedestnans. transit users and the automobiles On September 10, 1996 the City Council approved the first phase modifications to the downtown area circulation plan and appropriated funding In the amount of $150.000 for the deSign of these Improvements Discussion Requests for Proposals were sent to seven firms A pre-proposal conference was held by the cIty to review the scope of the project With the consultants Four proposals were received After a careful review of the proposals the city selected the consultmg firm of WPA TraffiC Englneenng, Inc to perform the deSign engineering task for thiS project WPA will be teaming With Oalcm Cummins ASSOCiates to perform the cIvil engineering work at Ocean Boulevard and Colorado Avenue, and Walker Parkmg Consultants for modifications to the Santa MonIca Place parkmg structures The estimated completion tIme for thiS deSign project IS eighteen weeks 2 Bud~etlFinancial Impact Appropnatlon authonty IS available In the Account # 01-770-415-20097-8900-99457 In the amount of $150.000 Additional contingency funds are available from the same account If It IS determined that such funds are necessary to cover the costs of addItional work The estimated cost of thIS deSign project IS as follows ProfeSSional englneenng contract $ 87.675 Contingencies (20%) $ 17,535 Total cost $ 105,210 As directed by Council, staff will be returning to Council dunng the mid-year budget process to request funds to construct the circulation changes It IS currently estimated the construction of thiS project Will cost $675,000 Recommendation It IS recommended that the City CouncIl 1 Authonze the City Manager to negotiate and execute a profeSSional services agreement for the deSign of first phase of downtown circulation plan With WPA TraffiC Englneenng, Inc In the amount of $87,675 2 AuthOrize the City Manager to execute amendments to thiS contract not to exceed $17.535, If necessary Prepared by Suzanne Fnck, Director of Planning and Community Development Ron Fuchlwakl, City Parking and TraffiC Engineer Jamal Rahlml, Senior TraffiC Engineer (bayclrc) 3 - --